This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
AUDUMBAR NEST BUILDING - C
Units
24 units
Mix
24 × 2 BHK
Carpet area
55–74 sq mper-unit range, as filed
Floors
3
Parking
4 spaces
Land area
3,861 sq m
Sanctioned built-up
1,327 sq m
Timeline
RERA registeredFeb 2023
Proposed completionDec 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
24 units across 6 batches
TypeArea sq mCount
2 BHK744
2 BHK704
2 BHK554
2 BHK614
2 BHK594
2 BHK614
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 277 mPrimary road 57 m · MIDC Road | Morawadi Road | Pimpri - Chikhali RoadRailway line 815 mMetro station 377m away (Pimpri Chinchwad Municipal Corporation (PCMC))Limited bus connectivity nearby
Water & environment
Water body 1.0 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~35 m of the recorded location in 2016 — before this project started in 2023. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~35 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~35 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
The yearly site view ends in 2023, before this project started in 2023.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹58,077per sq yd
₹69,460per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 103 divisions of “Pimpri Chinchawad (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹27,183 – ₹1,50,076 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Pimpri Chinchwad Municipal Corporation
Municipal Corporation
Building Permit
Survey no. 151/1/1, 151/2/1,151/3/1,151/4/1, having corresponding CTS No. 5998 to 6000 (part) at Village Pimpri Waghere
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pimpri Chinchwad Municipal Corporation
Municipal corporation
Has approved 1,391 RERA projects — about 1 in 14 in Maharashtra.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
3,279 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,383 projects the radar draws within 6 km — every kind, every stage — 438 are residential projects still under way. This list keeps only those, and looks further out.
7 projects within 1 km — showing the nearest 6.
30 m awayResidential / Group Housing
Audumbar Nest
Om Chidanand Developers · Shivane · Haveli
1 yr 9 mo
Mar 2025registered
Dec 2026target completion
Government Guidance Rate₹38,111/sq ydScale27 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
MahaRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/audumbar-nest-building-c-pimpri-chinchawad-m-haveli-ggk8p2gf.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.