The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Umbroli (553037)
Taluka
Ambarnath
District
Thane
Pincode
421204
Survey no.
Survey no 18 Hissa Nos 1A, 1B, 4A and 8
North boundary
24 Mtrs road and S No 17
East boundary
S No 16
South boundary
S No 19
West boundary
S No 20
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.8km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 1.9 km · Badlapur Pipeline RoadRailway line 3.9 kmRailway station 3.9km away (Nilaje)Limited bus connectivity nearby
Water & environment
River 461 mWater body 473 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹25,585per sq yd
₹30,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Umbroli (553037)”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Kalyan Dombivli Municipal Corporation
Municipal Corporation
Building Permit
Survey no. Survey no 18 Hissa Nos 1A, 1B, 4A and 8
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Kalyan Dombivli Municipal Corporation
Municipal corporation
Has approved 742 RERA projects — 3.7% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12502411
16 Jul 2025
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,668 residential projects still under way within 25 km. Step out ring by ring:
Of the 507 projects the radar draws within 6 km — every kind, every stage — 226 are residential projects still under way. This list keeps only those, and looks further out.