P52800027800 · MahaRERA · https://gethorizon.in/projects/belle-vue-dapoli-camp-t6hditzl

01

Complete project overview

MahaRERA · Registration filing
Project name
BELLE VUE
Units
22 units
Floors
4
Buildings
2
Parking
6 spaces
Land area
462 sq m
Sanctioned built-up
780 sq m
Recreational open space
780 sq m

Timeline

RERA registeredJan 2021
Proposed completionJun 2024
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Sewerage (Chamber,…0%
Water conservation…0%
Electrical meter r…0%
OC-readiness80%
Water Supply80%
Flat fit-out90%
External finishes97%
Excavation100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Stairs & lifts100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Cranfield Construction

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2021–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Dapoli Camp
Taluka
Dapoli
District
Ratnagiri
Pincode
415712
Survey no.
1527/C
North boundary
NW
East boundary
NE
South boundary
SE
West boundary
SW
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · Library 376m away
HealthcareHospital 217m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 535m away
Getting around
Primary road 236 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 764 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Dapoli Nagarpanchayat Dapoli

Building Permit
Survey no. 1527/C

The promised possession date (8 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

55 residential projects still under way within 25 km. Step out ring by ring:

Of the 117 projects the radar draws within 6 km — every kind, every stage — 25 are residential projects still under way. This list keeps only those, and looks further out.

13 projects within 1 km — showing the nearest 6.

410 m awayOthers

ABDUL GAFOOR RESIDENCY

Faraz Anwar Rakhange · Mauje Dapoli · Dapoli

Feb 2025registered
Dec 2027target completion
Scale24 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

PITAMBARI INDRADHANU VILLAGE

PITAMBARI PRODUCTS PVT LTD · Sakhroli · Dapoli

Dec 2020registered
Jun 2027target completion
Scale113 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

Whistling Meadows

Jeetesh Shankar Parihar · Jalgaon · Dapoli

Mar 2021registered
Jun 2026target completion
AuthorityMahaRERA
480 m awayResidential / Group Housing

ABDUL GAFOOR RESIDENCY

Kayum Ali Parkar · Mauje Dapoli · Dapoli

May 2022registered
Dec 2026target completion
AuthorityMahaRERA
480 m awayOthers

AARTI APARTMENT

Aniruddha Subhashchandra Butala · Dapoli Camp · Dapoli

Dec 2022registered
Dec 2026target completion
Scale15 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

Milestone

Chandrashekhar Sadashiv Lawate · Dapoli Camp · Dapoli

Feb 2025registered
May 2027target completion
Scale55 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.