HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

MAHAAJAN HORIZON

PM1280002500547 · MahaRERA · https://gethorizon.in/projects/mahaajan-horizon-dapoli-camp-dnk93hfl

01

Complete project overview

MahaRERA · Registration filing
Project name
MAHAAJAN HORIZON
Units
33 units
Floors
7
Buildings
2
Land area
686 sq m
Sanctioned built-up
1,609 sq m

Timeline

RERA registeredAug 2025
Proposed completionDec 2027
TodaySep 2026
Construction progress
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Electrical meter r…0%
Superstructure67%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Water Supply100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Mihir Deepak Mahajan

IndividualPromoter type
Ratnagiri, MAHARASHTRABased in
2Projects
1City
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
42 homeson the public record across 2 projects
2,040 sq mbuilt-up filed
1,048 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Mihir Deepak Mahajan— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 5 new projects last year
  • 122 nearby projects
1 km radius · coordinates as filed · 17.7616, 73.1787 · © OpenStreetMap contributors
Village
Dapoli Camp
Taluka
Dapoli
District
Ratnagiri
Pincode
415712
Survey no.
CTS No 2046, 2047,2048,2049 and 2050
North boundary
Land of Bal
East boundary
Dapoli Dabhol Road
South boundary
Land of Sawant
West boundary
Vahal
What’s nearby
Schools1 school within 1km · Library 1.9km away
HealthcareHospital 221m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 905m away
Getting around
Primary road 256 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 942 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Dapoli Nagar Panchayat

Municipal Council
Building Permit
Survey no. CTS No 2046, 2047,2048,2049 and 2050
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation

A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts about 1 in 2 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

49 residential projects still under way within 25 km. Step out ring by ring:

Of the 122 projects the radar draws within 6 km — every kind, every stage — 25 are residential projects still under way. This list keeps only those, and looks further out.

6 projects within 1 km — showing the nearest 6.

220 m awayResidential / Group Housing

SHRINIWAS RESIDENCY

SACHIN MANOHAR SHINDE · Gimhavane · Dapoli

Sep 2021registered
Aug 2026target completion
Scale31 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

SHREENIWAS RESIDENCY PHASE II

Sachin Manohar Shinde · Gimhavane · Dapoli

May 2025registered
Dec 2028target completion
Scale53 flatsAuthorityMahaRERA
480 m awayResidential / Group Housing

SIDDHATANU LANDMARK

SIDDHTANU DEVELOVERS · Dapoli Camp · Dapoli

Aug 2026registered
Mar 2029target completion
Scale90 flatsAuthorityMahaRERA
700 m awayResidential / Group Housing

Durvankur

ANKUR DEVELOPERS · Dapoli Camp · Dapoli

Sep 2026registered
Dec 2030target completion
Scale19 flatsAuthorityMahaRERA
790 m awayResidential / Group Housing

BAIG RESIDENCY

SHAHID ABDULLA RAKHANGE · Dapoli Camp · Dapoli

Jan 2025registered
Dec 2028target completion
Scale48 flatsAuthorityMahaRERA
850 m awayOthers

Vasant Varsha

Jayant Yeshwant Kolhatkar · Dapoli Camp · Dapoli

Oct 2023registered
Dec 2026target completion
Scale34 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mahaajan-horizon-dapoli-camp-dnk93hfl.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.