HORIZON
Share

Earth Enclave

P51900046831 · MahaRERA · https://gethorizon.in/projects/earth-enclave-girgaon-mumbai-city-suqayfxw

01

Complete project overview

MahaRERA · Registration filing
Project name
Earth Enclave
Units
238 units
Floors
55
Buildings
2
Parking
333 spaces
Land area
2,882 sq m
Sanctioned built-up
18,085 sq m
Recreational open space
246 sq m

Timeline

RERA registeredSep 2022
Proposed completionDec 2027
TodaySep 2026
Construction progress
Stilt floor0%
Storm Water Drains0%
Solid Waste Manage…0%
Water conservation…0%
Aggregate area of …0%
Internal finishes20%
Flat fit-out20%
Stairs & lifts20%
External finishes20%
OC-readiness20%
Water Supply20%
Sewerage (Chamber,…20%
Fire protection an…20%
Electrical meter r…25%
Podiums90%
Excavation100%
Basement (if any)100%
Plinth100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Earth Graphics

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
District
Mumbai City
Pincode
400004
Survey no.
683,684,685
North boundary
CS No 686 and CS No 690
East boundary
1st Parsiwada Lane
South boundary
Vithalbhai Patel Road
West boundary
2nd Parsiwada Lane
What’s nearby
Schools1 school within 1km · College or university 712m away · Library 1.4km away
HealthcareHospital 167m away · 7 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 873m away · 33+ restaurants and cafes within 1km
ShoppingSupermarket 831m away · Mall 560m away · Convenience store within 1km
Getting around
Expressway 1.9 km · A Patil FlyoverPrimary road 823 m · Ebrahim Rehmatullah RoadRailway line 792 m · WesternRailway(Fast)Metro station 481m away (Girgaon)Bus stop within 1km
Water & environment
Water body 1.1 km · Juma Masjid Pond
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 683,684,685
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

2,194 residential projects still under way within 25 km. Step out ring by ring:

Of the 598 projects the radar draws within 6 km — every kind, every stage — 202 are residential projects still under way. This list keeps only those, and looks further out.

39 projects within 1 km — showing the nearest 6.

150 m awayMixed

BELFORT BAY – MUMBADEVI

SHAILENDRA REALTORS PVT. LTD. · Mumbai City

Apr 2026registered
Dec 2031target completion
Scale122 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

SACH VINTAGE

USHADEVI VIJAYKUMAR CHANDAN · GIRGAON

Feb 2022registered
Dec 2026target completion
Scale22 flatsAuthorityMahaRERA
200 m awayOthers

BAFNA PRIDE

NAVYUG ENTERPRISES · Mumbai City

Jan 2025registered
Dec 2030target completion
Scale131 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

VIGHNAHARTA TEJDIL

TEJAS PRAKASH DHARIA · Mumbai City

Jul 2023registered
Dec 2028target completion
Scale82 flatsAuthorityMahaRERA
330 m awayOthers

Shreeji Heights

Anupam Creation · Mumbai City

Jul 2023registered
Dec 2030target completion
Scale90 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

NEBULA

RUBBERWALA REALTY · Mumbai City

Aug 2017registered
Jun 2026target completion
Scale122 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.