Dwarika Grande Vila
MADHUSUDAN AVAS PRIVATE LIMITED · Agra
G.G. VILLAGE E
Timeline
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹76.00 Lakh declared to build 17 plots. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
None on record with UP-RERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
19 plotted projects still under way within 25 km. Step out ring by ring:
Of the 68 projects the radar draws within 6 km — every kind, every stage — 1 is a plotted project still under way. This list keeps only those, and looks further out.
1 project between 3 and 6 km — showing the nearest 1.
MADHUSUDAN AVAS PRIVATE LIMITED · Agra
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you