HORIZON
Share

Golden Tower

P52600022854 · MahaRERA · https://gethorizon.in/projects/golden-tower-solapur-m-corp-solapur-north-11gjzt4s

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Golden Tower
Units
81 units
Mix
54 × Shop · 10 × 2 BHK · 8 × 1 BHK · 5 × 3 BHK · 4 × Hall
Carpet area
11–170 sq mper-unit range, as filed
Floors
9
Parking
39 spaces
Land area
1,488 sq m
Sanctioned built-up
2,049 sq m

Timeline

RERA registeredOct 2019
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

81 units across 42 batches
TypeArea sq mCount
Shop292
1 BHK402
Shop202
Shop212
Shop171
Shop171
Shop111
Shop154
Shop151
Shop151
Shop152
Shop244
Shop254
Shop281
Shop291
Shop174
Hall1302
Hall1701
Hall1541
Shop201
Shop441
Shop571
1 BHK406
2 BHK6310
3 BHK882
3 BHK893
Shop111
Shop111
Shop171
Shop181
Shop191
Shop154
Shop161
Shop171
Shop171
Shop132
Shop131
Shop141
Shop141
Shop171
Shop171
Shop171

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SAMIR WALMIK AHIRE PROPRIETOR OF PALLAVI REALTORS

IndividualPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2019–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Solapur (M Corp.)
Taluka
Solapur North
District
Solapur
Pincode
413004
Survey no.
Plot no 3 New S No 113 1B
North boundary
New S No 113B old S no 330 1B Part
East boundary
Plot no 2
South boundary
24 M wide road
West boundary
Plot no 4
What’s nearby
Schools1 school within 1km · College or university 1.2km away
HealthcareHospital 1.2km away
Lifestyle1 park within 500m
ShoppingSupermarket 459m away
Getting around
Expressway 4.9 km · Degaon RoadPrimary road 323 m · Vijapur RoadRailway line 2.3 kmRailway station 3.8km away (Tikekarwadi)Limited bus connectivity nearby
Water & environment
Canal 2.5 kmWater body 2.6 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹37,454per sq yd
₹44,795per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 42 divisions of “Solapur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹21,413₹57,149 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Solapur Municipal Corporation

Municipal Corporation
Building Permit
Survey no. Plot no 3 New S No 113 1B

The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Solapur Municipal Corporation

Municipal corporation

Has approved 66 RERA projects0.3% of Maharashtra.

an apartments market97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.

Builders
60
On record
617 flats · 102 plots
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

93 residential projects still under way within 25 km. Step out ring by ring:

Of the 238 projects the radar draws within 6 km — every kind, every stage — 77 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

SolapurResidential / Group Housing

SHAZNEEN GALAXY

NAZNEEN JAINODIN NADAF

Jun 2023registered
Dec 2026target completion
Government Guidance Rate₹37,454/sq ydScale15 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.