This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
81 units across 42 batches
TypeArea sq mCount
Shop292
1 BHK402
Shop202
Shop212
Shop171
Shop171
Shop111
Shop154
Shop151
Shop151
Shop152
Shop244
Shop254
Shop281
Shop291
Shop174
Hall1302
Hall1701
Hall1541
Shop201
Shop441
Shop571
1 BHK406
2 BHK6310
3 BHK882
3 BHK893
Shop111
Shop111
Shop171
Shop181
Shop191
Shop154
Shop161
Shop171
Shop171
Shop132
Shop131
Shop141
Shop141
Shop171
Shop171
Shop171
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Solapur (M Corp.)
Taluka
Solapur North
District
Solapur
Pincode
413004
Survey no.
Plot no 3 New S No 113 1B
North boundary
New S No 113B old S no 330 1B Part
East boundary
Plot no 2
South boundary
24 M wide road
West boundary
Plot no 4
What’s nearby
Schools1 school within 1km · College or university 1.2km away
HealthcareHospital 1.2km away
Lifestyle1 park within 500m
ShoppingSupermarket 459m away
Getting around
Expressway 4.9 km · Degaon RoadPrimary road 323 m · Vijapur RoadRailway line 2.3 kmRailway station 3.8km away (Tikekarwadi)Limited bus connectivity nearby
Water & environment
Canal 2.5 kmWater body 2.6 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹37,454per sq yd
₹44,795per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 42 divisions of “Solapur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹21,413 – ₹57,149 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Solapur Municipal Corporation
Municipal Corporation
Building Permit
Survey no. Plot no 3 New S No 113 1B
The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Solapur Municipal Corporation
Municipal corporation
Has approved 66 RERA projects — 0.3% of Maharashtra.
an apartments market — 97% apartments · 3% plotted layouts. Apartments like yours are this body's core business.
Builders
60
On record
617 flats · 102 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
MahaRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to MahaRERA appear here at all.
Number
Date
CC005000000269593
16 Oct 2023
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
93 residential projects still under way within 25 km. Step out ring by ring:
Of the 238 projects the radar draws within 6 km — every kind, every stage — 77 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
SolapurResidential / Group Housing
SHAZNEEN GALAXY
NAZNEEN JAINODIN NADAF
3 yr 6 mo
Jun 2023registered
Dec 2026target completion
Government Guidance Rate₹37,454/sq ydScale15 flatsAuthorityMahaRERA