Units
17 units
Floors
8
Buildings
2
Parking
23 spaces
Land area
606 sq m
Sanctioned built-up
1,176 sq m

Timeline

RERA registeredMar 2026
Proposed completionDec 2029
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Excavation20%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

SOSAR INFINITY LLP

Limited Liability PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Bandra
Taluka
Andheri
District
Mumbai Suburban
Pincode
400050
Survey no.
59
North boundary
Plot
East boundary
15th Road 12 Meter Wide
South boundary
Plot
West boundary
Plot
What’s nearby
Schools2 schools within 500m · 10 educational institutions within 1km · College or university 473m away
HealthcareHospital 301m away · 13 clinics within 1km · Pharmacy within 500m
LifestylePark 1.8km away · Playground within 500m · Gym or sports centre 291m away
ShoppingSupermarket 103m away · Mall 1.0km away · Convenience store within 500m
Getting around
Expressway 1.8 kmPrimary road 602 m · Swami Vivekanand RoadRailway line 782 m · Western Railway (Slow)Railway station 1.1km away (Khar Road)15 bus stops within 500m
Water & environment
Water body 898 m · Bandra Talao
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 59
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,486 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,860 projects the radar draws within 6 km — every kind, every stage — 702 are residential projects still under way. This list keeps only those, and looks further out.

65 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Summer Queen CHSL

L Nagpal Builders LLP · Bandra · Andheri

Apr 2025registered
Aug 2027target completion
AuthorityMahaRERA
60 m awayResidential / Group Housing

SHANGRILA

PARDIS TIRUMALA LLP · Greater Mumbai · Mumbai

Dec 2023registered
Dec 2026target completion
AuthorityMahaRERA
130 m awayResidential / Group Housing

KOHINOOR PALACE

ZENITH CONSTRUCTION CO · Others · CTSO Andheri

Aug 2025registered
Apr 2029target completion
Scale14 flatsAuthorityMahaRERA
250 m awayMixed

ICON OPUS 50

ICON DEVELOPERS RITWAL · Bandra · CTSO Bandra

Jul 2026registered
Mar 2028target completion
Scale28 flatsAuthorityMahaRERA
260 m awayMixed

THE SOLARIS

SOSAR ENTERPRISES · Mumbai Suburban · Kurla

Jun 2023registered
Dec 2026target completion
Scale32 flatsAuthorityMahaRERA
260 m awayResidential / Group Housing

NAMRATA

A P PROPERTIES · Bandra · Andheri

Jun 2026registered
Dec 2029target completion
Scale20 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.