The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Others
Taluka
CTSO Bandra
District
Mumbai Suburban
Pincode
400052
Survey no.
FP No. 576
North boundary
Plot No.577 of the TPS No. 111, Bandra
East boundary
Plot No.586 of the TPS.III, Bandra
South boundary
public road known as 1st Road
West boundary
public road known as 5thRoad
What’s nearby
Schools1 school within 500m · 9 educational institutions within 1km · College or university 526m away
HealthcareHospital 149m away · 12 clinics within 1km · Pharmacy within 500m
LifestylePark 1.7km away · Playground within 500m · Gym or sports centre 459m away
ShoppingSupermarket 274m away · Mall 1.3km away · Convenience store within 500m
Getting around
Expressway 1.8 kmPrimary road 660 m · Swami Vivekanand RoadRailway line 892 m · Central Railway (Harbour Line)Railway station 1.0km away (Khar Road)7 bus stops within 500m
Water & environment
Water body 1.1 km · Bandra Talao
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Municipal Corporation of Greater Mumbai
Municipal Corporation · MCGM
Building Permit
Survey no. FP No. 576
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation of Greater Mumbai
Municipal corporation
Has approved 2,862 RERA projects — about 1 in 7 in Maharashtra, more than any other body in the state.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,485 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,859 projects the radar draws within 6 km — every kind, every stage — 703 are residential projects still under way. This list keeps only those, and looks further out.