KAILASH COMPLEX PHASE 1

P52000054450 · MahaRERA · https://gethorizon.in/projects/kailash-complex-phase-1-mamdapur-karjat-554lvxh3

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
KAILASH COMPLEX PHASE 1
Floors
8
Parking
8 spaces
Land area
379 sq m
Sanctioned built-up
823 sq m
Recreational open space
380 sq m

Timeline

RERA registeredJan 2024
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

BRAMHA CONSTRUCTIONS

PartnershipPromoter type
Thane, MAHARASHTRABased in
2Projects
1City
2024–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2 projectson the public record across 2 projects
7,411 sq mbuilt-up filed
3,333 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Raigad Zilla Parishadthis project1 of 2 projects
Raigad Zilla Parishad Alibaug1 of 2 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from BRAMHA CONSTRUCTIONS— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Mamdapur
Taluka
Karjat
District
Raigarh
Pincode
410101
Survey no.
S.NO.169,PLOT NO. 8,S.NO.78,H.NO.78/9B,78/6,78/11
North boundary
S NO 79
East boundary
S NO 78 HISSA NO 8
South boundary
7500 MM WIDE ROAD
West boundary
S NO 78 HISSA NO 9A
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.0km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 660 m · Karjat RoadRailway line 946 m · Mumbai-Pune RailwayRailway station 1.4km away (Neral Junction)Limited bus connectivity nearby
Water & environment
Water body 708 mRiver 761 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Raigad Zilla Parishad

Building Permit
Survey no. S.NO.169,PLOT NO. 8,S.NO.78,H.NO.78/9B,78/6,78/11

The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Raigad Zilla Parishad

Planning authority

Has approved 16 RERA projects0.1% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
16
On record
25 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

1,326 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 314 projects the radar draws within 6 km — every kind, every stage — 83 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

19 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

KAILASH COMPLEX PHASE 2

BRAMHA CONSTRUCTIONS · Mamdapur · Karjat

Mar 2024registered
Mar 2027target completion
AuthorityMahaRERA
10 m awayMixed

ARENA ONE

TECTRA ENGINEERING · Mamdapur · Karjat

Aug 2026registered
Dec 2028target completion
Scale46 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

TOWER C-MARS,PLUTO

DREAMZ REALTY · Neral · Karjat

Jul 2023registered
Dec 2030target completion
Scale96 flatsAuthorityMahaRERA
50 m awayMixed

ASMA TOWER

MUJEEB BADRUDDIN ANSARI · Neral · Karjat

Oct 2025registered
Dec 2029target completion
Scale32 flatsAuthorityMahaRERA
110 m awayResidential / Group Housing

SUKOON RESIDENCY

RIFAA STRUCTURAL SOLUTIONS PRIVATE LIMITED · Mamdapur · Karjat

Jun 2022registered
Jun 2027target completion
Scale77 flatsAuthorityMahaRERA
310 m awayOthers

ZAINAB HEIGHTS

SHALIN DEVELOPERS · Mamdapur · Karjat

Jun 2024registered
Dec 2026target completion
Scale33 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.