HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

KESAR VIHAR

P50500031273 · MahaRERA · https://gethorizon.in/projects/kesar-vihar-bhilgaon-kamptee-i7v6c2kr

01

Complete project overview

MahaRERA · Registration filing
Plots
47 plots
Land area
7,297 sq m
Sanctioned built-up
7,297 sq m
Recreational open space
1,097 sq m

Timeline

RERA registeredOct 2021
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

KESAR INFRACON PRIVATE LIMITED

CompanyPromoter type
Nagpur, MAHARASHTRABased in
3Projects
1City
2021–2026Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
67 plotson the public record across 3 projects
11,377 sq mplotted area
11,377 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from KESAR INFRACON PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 22 new projects last year
  • 379 nearby projects
≈ locality centre · geocoded, verified · 21.1857, 79.1194 · © OpenStreetMap contributors
Village
Bhilgaon
Taluka
Kamptee
District
Nagpur
Pincode
440026
Survey no.
98/2
North boundary
Sur No 98-1
East boundary
Shiv Pandhan
South boundary
Owned by another person
West boundary
Sur No 99
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 862m away · 2 clinics within 1km
LifestylePark 610m away · Gym or sports centre 755m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 637m away
Getting around
Expressway 279 mPrimary road 78 m · LIC- Automotive Double Decker FlyoverRailway line 1.5 kmMetro station 20m away (Automotive Square)Bus stop within 1km
Water & environment
River 578 m · Pivli Nadi
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹4,239per sq yd
₹5,070per sq m
Which rate
open land
Matched to
The rate published for the village of “Bhilgaon”.
In force
2026-2027 schedule
Spread
₹1,171₹8,963 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

507 plotted projects still under way within 25 km. Step out ring by ring:

Of the 379 projects the radar draws within 6 km — every kind, every stage — 49 are plotted projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

BhilgaonPlotted

KESAR SIGNATURE

KESAR LANDS PRIVATE LIMITED

May 2021registered
Mar 2026target completion
Government Guidance Rate₹4,239/sq ydScale49 plotsAuthorityMahaRERA
NagpurPlotted

AYODHYA

AYODHYA MUKUNDA KESHAVAM

Feb 2025registered
Mar 2027target completion
Scale60 plotsAuthorityMahaRERA
BhilgaonPlotted

Mahakali Greens-2

Sandeep Manoharrao Bawankar & Tushar Manoharrao Bawankar

Jul 2025registered
Mar 2028target completion
Government Guidance Rate₹4,239/sq ydScale80 plotsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kesar-vihar-bhilgaon-kamptee-i7v6c2kr.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.