Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
85 units across 1 batch
TypeArea sq mCount
Commercial ( Offices + Showrooms )6385
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Municipal CorporationMunicipal / Corporationthis project4 of 5 projects
Ahmedabad Urban Development AuthorityUrban Development Authority1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
link, 100 Feet Road, Near Eulogia HotelOff. S.G Highway, Gota
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 953m away
LifestyleNo parks within 2km
ShoppingSupermarket 1.6km away · Mall 1.9km away
Getting around
Expressway 769 mPrimary road 2.7 kmRailway line 1.2 kmRailway station 2.3km away (Chandkheda Road)Limited bus connectivity nearby
Water & environment
Water body 1.2 km · Gota Lake
distances only — not a flood assessment
Land, title & encumbrance
Mortgage85 unit(s) mortgaged to STATE BANK OF INDIA · ₹2.82 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹26.86 Cr declared to build 85 flats. What that works out to:
₹12.74 Lakh – ₹1.44 Crdeclared unit pricerange on the filing — not a live asking price
₹31.60 Lakhdeclared cost per flatall-in — land + construction
20%of the cost is land₹2,110/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹9,824per sq yd
₹11,750per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “GOTA”.
In force
2011 schedule
Spread
₹6,271 – ₹13,796 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Ahmedabad Municipal Corporation
Municipal / Corporation
Building Permitapproved 2 Jan 2019 · 7 yrs ago
The promised possession date (31 Aug 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 13 Jun 2022)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Ahmedabad Municipal Corporation
Municipal Corporation
Has approved 3,250 RERA projects — about 1 in 5 in Gujarat, more than any other body in the state.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
2,712
On record
4,25,177 flats · 633 plots
Reach
6 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
What
Date
CMP/A/OFFLINE/Ahmedabad/23052025/00105
Complaint · Form A
21 Dec 2024
GJ/CMP/NCAR/Ahmedabad/210608/0024
Non-compliance · annual report
8 Jun 2021
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
327 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,351 projects the radar draws within 6 km — every kind, every stage — 43 are commercial projects still under way. This list keeps only those, and looks further out.