Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
BMRDA - Bangalore Metropolitan Region Development AuthorityUrban Development Authoritythis project4 of 5 projects
Local Planning AuthorityTown & Country Planning (DTCP)1 of 5 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.4 km · Dabaspete - Hosur HighwayPrimary road 489 m · Malur - Hosur - Adhiyamankottai RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.3 kmRiver 2.8 km · Dakshina Pinakini
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹48.00 Cr declared. What that works out to:
6%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Karnataka Department of Stamps & Registration — 2023-24 guidance-value gazettes
In Karnataka it’s called the guidance value.
₹12,542per sq yd
₹15,000per sq m
Which rate
site (guidance value)
Matched to
The rate published for “Thindlu”.
In force
effective Oct 2023
Spread
₹12,375 – ₹12,542 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Karnataka’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Karnataka · Approved building plan
BMRDA - Bangalore Metropolitan Region Development Authority
Urban Development Authority
Building Permit
The promised possession date (30 Apr 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
BMRDA
Urban Development Authority · Bangalore Metropolitan Region Development Authority
Has approved 550 RERA projects — about 1 in 16 in Karnataka.
a mixed market — 46% apartments · 54% plotted layouts.
Builders
441
On record
16,246 flats · 16,792 plots
Reach
14 taluks
Since
2017
More layout-heavy than Karnataka overall — 54% plots here vs 38% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
No count on file. RERA Karnataka publishes a complaints register, but this project’s record carries no count.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Karnataka
Litigation
None declared in this filing
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
505 residential projects still under way within 25 km. The nearest 6:
Of the 18 projects the radar draws within 6 km — every kind, every stage — none is a residential project still under way. This list keeps only those, and looks further out.