HORIZON
Share

Primrose MHADA 2

P51700053843 · MahaRERA · https://gethorizon.in/projects/primrose-mhada-2-usarghar-kalyan-g36gxbvs

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
474 units
Mix
318 × 2 BHK · 156 × 1 BHK
Carpet area
27–44 sq mper-unit range, as filed
Floors
24
Parking
906 spaces
Land area
1,179 sq m
Sanctioned built-up
27,656 sq m
Recreational open space
493 sq m

Timeline

RERA registeredDec 2023
Proposed completionMar 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

474 units across 3 batches
TypeArea sq mCount
1 BHK27156
2 BHK44226
2 BHK4492

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Runwal Residency Private Limited

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
18Projects
2Cities
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
8,845 homeson the public record across 18 projects
7,34,185 sq mbuilt-up filed
41,178 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Runwal Residency Private Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Usarghar
Taluka
Kalyan
District
Thane
Pincode
421204
Survey no.
Survey No. 50 (pt)
North boundary
Survey no 50 pt
East boundary
Bldg EWS LIG 1
South boundary
Survey no 50 pt
West boundary
30 m w D P Road
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km
HealthcareHospital 318m away · Clinic within 2km
LifestylePark 930m away
ShoppingNo supermarket within 2km · Bank 423m away
Getting around
Expressway 4.5 km · Kalyan Bhiwandi RoadPrimary road 12 m · Kalyan - Shil RoadRailway line 2.4 km · Mumbai-Pune RailwayRailway station 2.5km away (Thakurli)Limited bus connectivity nearby
Water & environment
Water body 201 m · Ganapati Visarjan PondRiver 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹46,740per sq yd
₹55,900per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Usarghar”.
In force
2026-2027 schedule
Spread
₹37,375₹64,131 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Mumbai Metropolitan Region Development Authority

Metropolitan Development Authority
Building Permit
Survey no. Survey No. 50 (pt)

The promised possession date (31 Mar 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Mumbai Metropolitan Region Development Authority

Metropolitan / development authority

Has approved 152 RERA projects0.8% of Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
93
On record
7,406 flats · 157 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,188 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,491 projects the radar draws within 6 km — every kind, every stage — 597 are residential projects still under way. This list keeps only those, and looks further out.

27 projects within 1 km — showing the nearest 6.

gharivleResidential / Group Housing

Runwal Gardens Phase 4 Bldg No. 37

Runwal Residency Private Limited

Feb 2022registered
Mar 2026target completion
4 open complaintsGovernment Guidance Rate₹49,415/sq ydScale282 flatsAuthorityMahaRERA
gharivleResidential / Group Housing

Runwal Gardens - Phase 8 - Bldg No. 44

Runwal Residency Private Limited

Nov 2022registered
Mar 2027target completion
Government Guidance Rate₹49,415/sq ydScale100 flatsAuthorityMahaRERA
UsargharOthers

Runwal Gardens Phase 6A Bldg No. 53-54

Runwal Residency Private Limited

Jun 2023registered
Sep 2027target completion
Government Guidance Rate₹46,740/sq ydScale903 flatsAuthorityMahaRERA
gharivleResidential / Group Housing

Runwal Gardens Phase 8 Bldg No. 43 and 45

Runwal Residency Private Limited

Aug 2023registered
Dec 2026target completion
1 open complaintGovernment Guidance Rate₹49,415/sq ydScale248 flatsAuthorityMahaRERA
ThaneResidential / Group Housing

DYNAMIC CREST PHASE II - TITLIS

SNEH MAKEWELL LLP

Mar 2025registered
Jul 2028target completion
Government Guidance Rate₹60,034/sq ydScale147 flatsAuthorityMahaRERA
ThaneOthers

Vinayak Complex Phase-I

Vinayak Construction

Apr 2025registered
Dec 2029target completion
Government Guidance Rate₹60,034/sq ydScale145 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.