RERAA JO 160 OF 2021 · RERA Assam · https://gethorizon.in/projects/prince-enclave-phase-ii-jorhat-r8je4ouu
Registration lapsed
This project’s RERA Assam registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with RERA Assam before you rely on anything below.
01
Complete project overview
RERA Assam · Registration filing
Registration category
ONGOINGnew vs ongoing at registration
Land area
3,638 sq m
Local land measure
2B 3K 12L
RERA validity
31 Mar 2021this validity has passed
Timeline
RERA registeredMar 2018
Proposed completionDec 2022
TodaySep 2026
Construction progress
75% overall, as filed
Self-declared % complete as filed with RERA Assam when this ongoing project was registered — a snapshot at registration, not a live tracker.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
RERA Assam · Registration filing
District
JORHAT
Mouza / circle
JORHAT EAST
Town / village
JORHAT
Landmark
TARAJAN
Site address
BARUAH CHARIALI, TARAJAN, JORHAT, ASSAM
Pincode
785010
What’s nearby
Schools3 schools within 1km · 6 educational institutions within 1km · College or university 544m away
HealthcareHospital 393m away · 15 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · 12+ restaurants and cafes within 1km
Expressway 53 m · AT RoadPrimary road 559 m · Mahatma Gandhi RoadRailway line 1.3 kmRailway station 1.5km away (Jorhat Town)2 bus stops within 500m
Water & environment
Water body 218 mRiver 1.5 km · Bhogdoi River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
approved 7 Mar 2018 · 8 yrs ago
Building Permit no. JMB/Bldg. Per/Ward No. 12/2018/104 dtd. 07/03/2018
The promised possession date (31 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan JMB/Bldg. Per/Ward No. 12/2018/104 dtd. 07/03/2018 on the approving authority’s portal to confirm the approval.
Planning authority — done
06
Complaints & litigation
RERA Assam · public record
Complaints register
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
37 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 75 projects the radar draws within 6 km — every kind, every stage — 34 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.