Runwal Nexus

P51800055982 · MahaRERA · https://gethorizon.in/projects/runwal-nexus-malad-borivali-oclf63as

01

Complete project overview

MahaRERA · Registration filing
Units
25 units
Floors
5
Buildings
2
Parking
35 spaces
Land area
344 sq m
Sanctioned built-up
1,751 sq m

Timeline

RERA registeredMay 2024
Proposed completionDec 2026
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Asmira Ventures Private Limited

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
2Projects
1City
2024–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
148 homeson the public record across 2 projects
21,841 sq mbuilt-up filed
1,568 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Asmira Ventures Private Limited— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Malad
Taluka
Borivali
District
Mumbai Suburban
Pincode
400064
Survey no.
CTS NO 382 A PT
North boundary
LAYOUT RG NO 2
East boundary
18 M WIDE D P ROAD
South boundary
ANOTHER BLDG OF LAYOUT
West boundary
LINK ROAD
What’s nearby
Schools2 schools within 1km · College or university 1.4km away
HealthcareHospital 148m away · 6 clinics within 1km · Doctor's clinic within 1km
LifestylePark 922m away · Gym or sports centre 264m away · 11+ restaurants and cafes within 1km
ShoppingSupermarket 72m away · Mall 198m away · Bank 784m away
Getting around
Expressway 2.4 km · Western Express HighwayPrimary road 20 mRailway line 1.4 km · Western Railway (Slow)Metro station 179m away (Malad (West))Bus stop within 500m
Water & environment
Water body 280 mRiver 610 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. CTS NO 382 A PT
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

223 commercial projects still under way within 25 km. Step out ring by ring:

Of the 2,158 projects the radar draws within 6 km — every kind, every stage — 44 are commercial projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

MaladCommercial

AVIRA JEWELLERY HUB

AVIRA REALTY PRIVATE LIMITED

Oct 2023registered
Sep 2027target completion
Scale228 flatsAuthorityMahaRERA
Greater MumbaiCommercial

MARQUIS RESIDENCES PHASE 1

EMBASSY ENTERPRISES

May 2023registered
Dec 2027target completion
Scale10 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.