This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kalyan-Dombivali (M Corp.)
Taluka
Kalyan
District
Thane
Pincode
421306
Survey no.
CTC 691 To 715 S N 5A H No 8
North boundary
Fulware and Other Chawl
East boundary
Mauje Tisgaon Shiv
South boundary
Ulhasnagar Puna Link Road
West boundary
6 Mtr wide Road
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 129m away · 2 clinics within 1km
LifestylePark 1.4km away
ShoppingNo supermarket within 2km
Getting around
Expressway 2.6 kmPrimary road 309 m · Kalyan - Shil RoadRailway line 954 mRailway station 1.5km away (Kalyan Junction)Limited bus connectivity nearby
Water & environment
Water body 1.6 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹49,415per sq yd
₹59,100per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 61 divisions of “Kalyan-Dombivali (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,672 – ₹81,439 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Kalyan Dombivli Municipal Corporation
Municipal Corporation
Building Permit
Survey no. CTC 691 To 715 S N 5A H No 8
The promised possession date (30 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Kalyan Dombivli Municipal Corporation
Municipal corporation
Has approved 742 RERA projects — 3.7% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,880 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,764 projects the radar draws within 6 km — every kind, every stage — 681 are residential projects still under way. This list keeps only those, and looks further out.
29 projects within 1 km — showing the nearest 6.
180 m awayResidential / Group Housing
THE VAIDIKI SIGNATURE - B WING
SHREE JARI MARI DEVELOPERS LLP · Adivali · Kalyan
4 yr 7 mo
May 2022registered
Dec 2026target completion
Government Guidance Rate₹21,907/sq ydScale144 flatsAuthorityMahaRERA