The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Chande
Taluka
Mulshi
District
Pune
Pincode
412115
Survey no.
GAT No. 116P
North boundary
By Land out of GAT No 116
East boundary
By Land out of GAT No 115
South boundary
By Land out of GAT No 116
West boundary
12 Meter Road
What’s nearby
SchoolsNearest school 1.2km away
HealthcareHospital 2.0km away
LifestylePark 1.7km away
ShoppingSupermarket 1.9km away
Getting around
Primary road 2.0 km · Maan RoadMetro station 3.4km away (Megapolis Circle)Limited bus connectivity nearby
Water & environment
Water body 388 mRiver 557 m · Mula
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹1,56,598per sq yd
₹1,87,290per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Chande”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Building Permit
Survey no. GAT No. 116P
The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12603369
2 Jun 2026
Roznama Approvedopen
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,999 residential projects still under way within 25 km. Step out ring by ring:
Of the 473 projects the radar draws within 6 km — every kind, every stage — 149 are residential projects still under way. This list keeps only those, and looks further out.