Building B2 Eon Homes

P52100048176 · MahaRERA · https://gethorizon.in/projects/building-b2-eon-homes-man-mulshi-ed0fjnje

01

Complete project overview

MahaRERA · Registration filing
Floors
24
Buildings
2
Parking
193 spaces
Land area
840 sq m
Sanctioned built-up
16,989 sq m
Recreational open space
9,086 sq m

Timeline

RERA registeredDec 2022
Proposed completionDec 2027
TodaySep 2026
Construction progress
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Aggregate area of …0%
Open Parking0%
Basement (if any)25%
Plinth25%
Community Building…90%
Excavation100%
Treatment And Disp…100%
Electrical meter r…100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Hinjawadi Infradevelopment Pvt Ltd

CompanyPromoter type
Pune, MAHARASHTRABased in
14Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,054 homeson the public record across 14 projects
1,73,841 sq mbuilt-up filed
15,711 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Hinjawadi Infradevelopment Pvt Ltd— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 20 new projects last year
  • 316 nearby projects
1 km radius · coordinates as filed · 18.5788, 73.6909 · © OpenStreetMap contributors
Village
Man
Taluka
Mulshi
District
Pune
Pincode
411057
Survey no.
Plot R-3/1 Part
North boundary
Portion of layout Podium
East boundary
Portion of layout
South boundary
Portion of layout Pheriphery road and compound wal
West boundary
Portion of layout Building B1
What’s nearby
SchoolsNearest school 1.9km away
HealthcareHospital 500m away · 4 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 754m away · 5 restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Convenience store within 1km · Bank 378m away
Getting around
Primary road 276 m · Megapolis CircleMetro station 305m away (Megapolis Circle)4 bus stops within 500m
Water & environment
Water body 319 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~20 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Feb 2023
Apr 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate sits 3-10 km from other projects with the same pincode.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

2,730 residential projects still under way within 25 km. Step out ring by ring:

Of the 316 projects the radar draws within 6 km — every kind, every stage — 115 are residential projects still under way. This list keeps only those, and looks further out.

10 projects within 1 km — showing the nearest 6.

120 m awayResidential / Group Housing

Building C2 Eon Homes

Hinjawadi Infradevelopment Pvt Ltd · Man · Mulshi

Aug 2022registered
Dec 2027target completion
AuthorityMahaRERA
170 m awayResidential / Group Housing

Building C1 Eon Homes

Hinjawadi Infradevelopment Pvt Ltd · Man · Mulshi

Mar 2024registered
Jan 2029target completion
AuthorityMahaRERA
350 m awayResidential / Group Housing

Hinjewadi Phase 3-Tower 1

BELLISSIMO INFRATECH PRIVATE LIMITED · Maan · Mulshi

Mar 2026registered
Jun 2031target completion
Scale124 flatsAuthorityMahaRERA
350 m awayResidential / Group Housing

Hinjewadi Phase 3 - Tower 2

BELLISSIMO INFRATECH PRIVATE LIMITED · Maan · Mulshi

Mar 2026registered
Jun 2031target completion
Scale124 flatsAuthorityMahaRERA
350 m awayResidential / Group Housing

Hinjewadi Phase 3 - Tower 15

BELLISSIMO INFRATECH PRIVATE LIMITED · Maan · Mulshi

Feb 2026registered
Dec 2030target completion
Scale124 flatsAuthorityMahaRERA
350 m awayResidential / Group Housing

Hinjewadi Phase 3 - Tower 16

BELLISSIMO INFRATECH PRIVATE LIMITED · Man · Mulshi

Mar 2026registered
Dec 2030target completion
Scale124 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/building-b2-eon-homes-man-mulshi-ed0fjnje.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.