HORIZON
Share

VTP Leonara building C and F

P52100019994 · MahaRERA · https://gethorizon.in/projects/vtp-leonara-building-c-and-f-mahalunge-mulshi-p4cycr4d

01

Complete project overview

MahaRERA · Registration filing
Units
396 units
Mix
220 × 1 BHK · 88 × 2 BHK · 88 × 3 BHK
Carpet area
32–83 sq mper-unit range, as filed
Floors
26
Buildings
2
Parking
105 spaces
Land area
1,321 sq m
Sanctioned built-up
26,145 sq m

Timeline

RERA registeredMar 2019
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

396 units across 6 batches
TypeArea sq mCount
2 BHK5644
3 BHK7744
2 BHK5244
3 BHK8344
1 BHK3388
1 BHK32132

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

NNP BUILDCON PRIVATE LIMITED

CompanyPromoter type
Pune, MAHARASHTRABased in
2Projects
1City
2019–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
748 homeson the public record across 2 projects
53,431 sq mbuilt-up filed
2,703 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from NNP BUILDCON PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Mahalunge
Taluka
Mulshi
District
Pune
Pincode
411045
Survey no.
Sno47/1,47/2 and 47/3
North boundary
Building B
East boundary
sno47 hissa no 4 and drive way
South boundary
Building G
West boundary
Drive way of Leonara
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.1km away · Clinic within 2km · Pharmacy within 1km
LifestylePark 1.7km away · Gym or sports centre 1.1km away
ShoppingNo supermarket within 2km · Bank 729m away
Getting around
Primary road 665 m · Maan RoadMetro station 974m away (Doehler India)Bus stop within 1km
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹62,300per sq yd
₹74,510per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Mahalunge”.
In force
2026-2027 schedule
Spread
₹40,209₹64,449 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

2,948 residential projects still under way within 25 km. Step out ring by ring:

Of the 731 projects the radar draws within 6 km — every kind, every stage — 233 are residential projects still under way. This list keeps only those, and looks further out.

8 projects within 1 km — showing the nearest 6.

490 m awayResidential / Group Housing

Swanand Residency

Palande Associates · Man · Mulshi

Nov 2022registered
Mar 2026target completion
Scale30 flatsAuthorityMahaRERA
490 m awayOthers

Avishkar Ridhima

ARUN BABAN MARATHE · Man · Mulshi

Oct 2023registered
Dec 2026target completion
Scale124 flatsAuthorityMahaRERA
490 m awayResidential / Group Housing

VYOMORA PHASE 1

Joyville Shapoorji Housing Private Limited · Maan · Mulshi

Jul 2026registered
Apr 2031target completion
Scale40 flatsAuthorityMahaRERA
630 m awayResidential / Group Housing

Apostrophe Hinjawadi Tower B

HINJAWADI INFRADEVELOPMENT PVT LTD · Man · Mulshi

Dec 2022registered
Dec 2027target completion
AuthorityMahaRERA
670 m awayMixed

41 Commune - Hinjewadi

KEYS KRISALA INFRACON LLP · Man · Mulshi

Oct 2024registered
Dec 2028target completion
Scale362 flatsAuthorityMahaRERA
750 m awayResidential / Group Housing

ROSHAN MILESTONE WING F

RAHUL BHAGWANDAS SANKLA · Tathwade · Mulshi

May 2023registered
Dec 2028target completion
Government Guidance Rate₹58,805/sq ydScale68 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.