HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

SOLITAIRE HEIGHT

P99000050286 · MahaRERA · https://gethorizon.in/projects/solitaire-height-kudan-palghar-b9jr598p

01

Complete project overview

MahaRERA · Registration filing
Units
74 units
Floors
6
Buildings
2
Parking
51 spaces
Land area
3,000 sq m
Sanctioned built-up
3,511 sq m

Timeline

RERA registeredApr 2023
Proposed completionDec 2025
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Street Lighting0%
Water conservation…0%
Electrical meter r…0%
Open Parking0%
Excavation100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

AFFAK ARIF MOTIWALA

IndividualPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2023–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 43 new projects last year
  • 597 nearby projects
1 km radius · coordinates as filed · 19.6967, 72.7699 · © OpenStreetMap contributors
Village
Kudan
Taluka
Palghar
District
Palghar
Pincode
401502
Survey no.
GUT NO 66 HISSA NO 1
North boundary
GUT NO 64
East boundary
GUT NO 56
South boundary
GUT NO 67A
West boundary
GUT NO 65
What’s nearby
SchoolsNearest school 1.0km away
HealthcareHospital 179m away · 4 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Bank 49m away
Getting around
Expressway 1.1 kmPrimary road 813 mRailway line 255 mRailway station 247m away (Palghar)Limited bus connectivity nearby
Water & environment
Water body 665 m · Water TankRiver 2.2 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹32,275per sq yd
₹38,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Kudan”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Palghar Office Collector

Collector office
Building Permit
Survey no. GUT NO 66 HISSA NO 1

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

362 residential projects still under way within 25 km. Step out ring by ring:

Of the 597 projects the radar draws within 6 km — every kind, every stage — 173 are residential projects still under way. This list keeps only those, and looks further out.

80 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Nisarg Shrushti Phase-2

Arvel Realtors · Tembhode · Palghar

Oct 2019registered
Nov 2026target completion
Scale51 flatsAuthorityMahaRERA
10 m awayMixed

ROMAN RESIDENCY

Shantee Housing · Vasai-Virar City · Vasai

Aug 2021registered
Dec 2027target completion
Government Guidance Rate₹30,017/sq ydScale3 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SAMAIRA RESIDENCY

AV CRYSTAL SPACE · Vasai-Virar City · Vasai

Jan 2022registered
Dec 2026target completion
Government Guidance Rate₹30,017/sq ydScale109 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Gopikisan Patil Complex Bldg No 1

SUMATINATH ENTERPRISES · Chandrapada · Vasai

Dec 2021registered
Dec 2027target completion
Government Guidance Rate₹37,375/sq ydScale197 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

SAI ENCLAVE BUILDING NO.2

M/S. RADHEYA CONSTRUCTION COMPANY · Tivari · Vasai

May 2022registered
Dec 2029target completion
Government Guidance Rate₹50,753/sq ydAuthorityMahaRERA
10 m awayOthers

JK HERITAGE

VAILANKANNI REALTORS · VASAI · Vasai

Sep 2022registered
Dec 2027target completion
Scale6 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/solitaire-height-kudan-palghar-b9jr598p.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.