This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
182 units across 24 batches
TypeArea sq mCount
Office391
2.5 BHK7328
Shop191
Office433
3 BHK10012
2.5 BHK7524
Office121
Office252
Shop382
Shop591
Shop633
Shop641
Shop642
Office423
Office252
3 BHK8814
2.5 BHK7548
Shop382
2 BHK7214
2.5 BHK7612
Shop171
Office422
Office121
Shop632
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 11 educational institutions within 1km · College or university 916m away
HealthcareHospital 145m away · 19 clinics within 1km · Doctor's clinic within 1km
LifestylePark 566m away · Gym or sports centre 736m away · 18+ restaurants and cafes within 1km
ShoppingSupermarket 899m away · Convenience store within 1km · Bank 289m away
Getting around
Expressway 75 m · Shivaji RoadPrimary road 856 m · Kamgar PutalaRailway line 783 mMetro station 321m away (Kasba Peth)13 bus stops within 500m
Water & environment
Water body 139 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹68,746per sq yd
₹82,220per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Wakad”.
In force
2026-2027 schedule
Spread
₹41,397 – ₹86,957 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation
A city municipal corporation that approves projects within its own limits. It has approved 12,653 RERA projects across 34 districts — about 1 in 2 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,195 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,827 projects the radar draws within 6 km — every kind, every stage — 646 are residential projects still under way. This list keeps only those, and looks further out.
64 projects within 1 km — showing the nearest 6.
10 m awayResidential / Group Housing
VISION EXOTICA PHASE-II
VISION AVIS GROUPS · Bhosari · Haveli
4 yr 10 mo
Feb 2022registered
Dec 2026target completion
Government Guidance Rate₹41,280/sq ydScale168 flatsAuthorityMahaRERA