HORIZON
Share

TEJAL

P51900024363 · MahaRERA · https://gethorizon.in/projects/tejal-mumbai-city-9pmcs728

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
12 units
Floors
22
Buildings
2
Parking
28 spaces
Land area
592 sq m
Sanctioned built-up
1,776 sq m

Timeline

RERA registeredFeb 2020
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

UHP DEVELOPERS & CONSULTANTS

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2020–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400025
Survey no.
77-10
North boundary
C S No 78-10
East boundary
Plot No 82-10
South boundary
Sir Bhalchandra Marg
West boundary
Hindu Colouny Road No-2
What’s nearby
Schools3 schools within 500m · 11 educational institutions within 1km · College or university 633m away
HealthcareHospital 87m away · 17 clinics within 1km · Pharmacy within 500m
LifestylePark 1.1km away · Gym or sports centre 910m away · 40+ restaurants and cafes within 1km
ShoppingSupermarket 1.3km away · Mall 1.6km away · Convenience store within 500m
Getting around
Expressway 146 m · Dadar TT flyoverPrimary road 175 m · Tilak RoadRailway line 253 m · Central Railway (Express)Railway station 530m away (Dadar)14 bus stops within 500m
Water & environment
Water body 1.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 77-10

The promised possession date (30 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,350 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,363 projects the radar draws within 6 km — every kind, every stage — 501 are residential projects still under way. This list keeps only those, and looks further out.

54 projects within 1 km — showing the nearest 6.

50 m awayResidential / Group Housing

TULSI HERITAGE

BLUE STONE DEVELOPERS LLP · DADAR MUMBAI

Jun 2024registered
Sep 2028target completion
Scale22 flatsAuthorityMahaRERA
70 m awayResidential / Group Housing

Sanghvi Optima

Suparshwa Homes Private Limited · Dadar

Aug 2024registered
May 2028target completion
Scale23 flatsAuthorityMahaRERA
90 m awayResidential / Group Housing

BHALCHANDRA NIWAS CHS

ISHAAN REALTORS · HINDU COLONY DADAR

Apr 2023registered
Dec 2026target completion
AuthorityMahaRERA
90 m awayResidential / Group Housing

PURANDARE PARK CHSL

DEVESH NARENDRA JANI · DADAR

Aug 2022registered
Dec 2026target completion
Scale84 flatsAuthorityMahaRERA
150 m awayOthers

Krishna Kunj

Endemic Properties LLP · Matunga

Jan 2025registered
Sep 2029target completion
Scale25 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

Ram Setu Bhavan

GBD INFRACON LLP · MATUNGA DIVISION

Mar 2024registered
Dec 2028target completion
Scale59 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.