HORIZON
Share

Bombay Dyeing Mill

P51900004280 · MahaRERA · https://gethorizon.in/projects/bombay-dyeing-mill-mumbai-city-ega607xc

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Bombay Dyeing Mill
Units
3,350 units
Mix
3350 × Ews
Carpet area
21–21 sq mper-unit range, as filed
Floors
26
Buildings
11
Parking
524 spaces
Land area
22,549 sq m
Sanctioned built-up
98,501 sq m
Recreational open space
2,290 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2018
TodaySep 2026

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

3,350 units across 2 batches
TypeArea sq mCount
Ews211,296
Ews212,054

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

MHADA

Public AuthorityPromoter type
Mumbai Suburban, MAHARASHTRABased in
16Projects
3Cities
2017–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
9,469 homeson the public record across 16 projects
4,90,458 sq mbuilt-up filed
2,27,535 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MHADA— the full portfolio →

03

Location

MahaRERA · Registration filing
District
Mumbai City
Pincode
400014
Survey no.
CS No 223 Pt 1/983 Pt
North boundary
MCGM Open Space
East boundary
Naprol Tower
South boundary
Cemetery
West boundary
MCGM Open Space
What’s nearby
Schools1 school within 500m · 11 educational institutions within 1km · College or university 620m away
HealthcareHospital 95m away · 15 clinics within 1km · Pharmacy within 500m
LifestylePark 1.6km away · Gym or sports centre 422m away · 24+ restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 1.4km away · Convenience store within 500m
Getting around
Expressway 10 m · Dadar TT flyoverPrimary road 407 m · Tilak RoadRailway line 397 m · Central Railway (Slow)Railway station 384m away (Dadar)12 bus stops within 500m
Water & environment
Water body 829 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,241 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,239 projects the radar draws within 6 km — every kind, every stage — 455 are residential projects still under way. This list keeps only those, and looks further out.

41 projects within 1 km — showing the nearest 6.

280 m awayOthers

AAI SATIDEVI PARADISE

SHREENATH DEVELOPERS · Mulund · Kurla

Feb 2024registered
Mar 2026target completion
1 open complaintScale128 flatsAuthorityMahaRERA
350 m awayResidential / Group Housing

Monopoli

Mathuresh Infrapro Private Ltd · Naigaon

Mar 2023registered
Sep 2027target completion
Scale256 flatsAuthorityMahaRERA
360 m awayResidential / Group Housing

Pole Star

OM SHANTI HOUSING DEVELOPMENT COMPANY · Mumbai City

Jun 2023registered
Dec 2027target completion
Scale38 flatsAuthorityMahaRERA
390 m awayOthers

Shree Niwas

Endemic Properties LLP · Matunga

Oct 2024registered
Jun 2029target completion
Scale22 flatsAuthorityMahaRERA
410 m awayResidential / Group Housing

The Baya Sunrise

RENAISSANCE SPACES · DADAR EAST

Apr 2024registered
Dec 2029target completion
Scale230 flatsAuthorityMahaRERA
430 m awayResidential / Group Housing

Ram Setu Bhavan

GBD INFRACON LLP · MATUNGA DIVISION

Mar 2024registered
Dec 2028target completion
Scale59 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.