HORIZON
Share

VIVA EMBRO PARK

PR/GJ/SURAT/SURAT CITY/SUDA/PAA09668/050122 · GujRERA · https://gethorizon.in/projects/viva-embro-park-surat-city-lpo824fy

01

Complete project overview

GujRERA · Registration filing
Plots
33 plots
Mix
33 × Others
Carpet area
105–268 sq mper-unit range, as filed
Land area
6,596 sq m

Timeline

Project startedNov 2021
RERA registeredJan 2022
Proposed completionDec 2022
TodaySep 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

33 units across 1 batch
TypeArea sq mCount
Others13433

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

VIVA CORPORATION

PARTNERSHIP FIRMPromoter type
Surat, GujaratBased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Surat City
District
Surat
Address
VIVA EMBRO PARK FP 6 TPS 39OPP NARAYAN NAGAR INDUSTRIAL LIMBAYAT
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 418m away · 15 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 kmPrimary road 2.1 kmRailway line 1.2 kmMetro station 1.3km away (Anjana Farm)Limited bus connectivity nearby
Water & environment
River 189 mCanal 698 m
distances only — not a flood assessment
Land, title & encumbrance
MortgageLoan outstanding · ₹16.1 Lakh outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹4.25 Cr declared to build 33 plots. What that works out to:

₹10.60 Lakh – ₹26.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹12.88 Lakhdeclared cost per plotall-in — land + construction
₹599/sq ftof plotted area₹6,446/sq m
92%of the cost is land₹550/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

₹8,779per sq yd
₹10,500per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “LIMBAYAT”.
In force
2011 schedule

What this number is — and isn’t

  • The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

GujRERA · Approved building plan

Surat Urban Development Authority

Urban Development Authority
Layout Permitapproved 5 Jan 2022 · 4 yrs ago

The promised possession date (3 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 1 block carry a Building-Use (BU) permission (latest 30 Nov 2022)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

Surat Urban Development Authority

Urban Development Authority

Has approved 895 RERA projectsabout 1 in 19 in Gujarat.

a mixed market65% apartments · 35% plotted layouts.

Builders
734
On record
1,12,087 flats · 25,390 plots
Reach
14 talukas
Since
2008

More layout-heavy than Gujarat overall — 35% plots here vs 6% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

414 plotted projects still under way within 25 km. Step out ring by ring:

Of the 586 projects the radar draws within 6 km — every kind, every stage — 101 are plotted projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

700 m awayPlotted Development

HTC-3 The Business Park

SHIV ENTERPRISE · Surat City

Mar 2026registered
Mar 2027target completion
Price band₹51.00 Lakh–₹1.50 CrScale74 plotsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.