HORIZON
Share

Acons Prive

P52000030437 · MahaRERA · https://gethorizon.in/projects/acons-prive-chendhre-alibag-bqmayegj

01

Complete project overview

MahaRERA · Registration filing
Units
109 units
Floors
7
Buildings
4
Parking
2 spaces
Land area
2,250 sq m
Sanctioned built-up
5,131 sq m

Timeline

RERA registeredAug 2021
Proposed completionDec 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Akshay Gulati

IndividualPromoter type
Raigarh, MAHARASHTRABased in
2Projects
1City
2017–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
118 homeson the public record across 2 projects
5,420 sq mbuilt-up filed
2,539 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Akshay Gulati— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Chendhre
Taluka
Alibag
District
Raigarh
Pincode
402201
Survey no.
Survey No. 16, Hissa No. 4 B
North boundary
Road
East boundary
Road
South boundary
Road
West boundary
Society
What’s nearby
SchoolsNo schools within 2km · College or university 1.7km away
HealthcareHospital 730m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestylePark 826m away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.0 km · Alibag RoadPrimary road 301 m · Alibaug Rewas RoadRailway line 4.0 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 310 mRiver 1.7 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Collector Of Raigarh

Collector office
Building Permit
Survey no. Survey No. 16, Hissa No. 4 B

The promised possession date (1 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

79 residential projects still under way within 25 km. Step out ring by ring:

Of the 100 projects the radar draws within 6 km — every kind, every stage — 33 are residential projects still under way. This list keeps only those, and looks further out.

17 projects within 1 km — showing the nearest 6.

180 m awayResidential / Group Housing

Alibag Bliss

ACORP · Chendhre · Alibag

Apr 2023registered
Dec 2029target completion
AuthorityMahaRERA
240 m awayResidential / Group Housing

JANKI NIWAS

DWINETRA DEVELOPERS · Chendhre · Alibag

Aug 2025registered
Jun 2027target completion
Scale17 flatsAuthorityMahaRERA
280 m awayMixed

Shree Radha Krishna Residency

SHREE RADHA ENTERPRISES · Chendhre · Alibag

Mar 2026registered
May 2027target completion
Scale32 flatsAuthorityMahaRERA
360 m awayResidential / Group Housing

Alibag Westend

ACORP · Varasoli · Alibag

Mar 2022registered
Dec 2027target completion
Scale12 flatsAuthorityMahaRERA
360 m awayResidential / Group Housing

Alibag Paradise

ACORP · Chendhre · Alibag

Mar 2022registered
Dec 2027target completion
Scale18 flatsAuthorityMahaRERA
470 m awayMixed

KARNIK SAGAR RESIDENCY

JAYANT KRISHNA SHETH · Chendhre · Alibag

Jul 2026registered
Mar 2030target completion
Scale25 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.