Indraprastha Building 6

PR1270002500308 · MahaRERA · https://gethorizon.in/projects/indraprastha-building-6-gondhalpada-alibag-imflwqpt

01

Complete project overview

MahaRERA · Registration filing
Project name
Indraprastha Building 6
Units
32 units
Floors
5
Buildings
4
Parking
28 spaces
Land area
14,110 sq m
Sanctioned built-up
1,412 sq m
Recreational open space
1,415 sq m

Timeline

RERA registeredJul 2025
Proposed completionDec 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

M/S INDRAPRASTHA ASSOCIATES

AOP/BOIPromoter type
Raigarh, MAHARASHTRABased in
2Projects
1City
2018–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
100 homeson the public record across 2 projects
4,158 sq mbuilt-up filed
16,856 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from M/S INDRAPRASTHA ASSOCIATES— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 13 new projects last year
  • 104 nearby projects
1 km radius · coordinates as filed · 18.6592, 72.8858 · © OpenStreetMap contributors
Village
Gondhalpada
Taluka
Alibag
District
Raigarh
Pincode
402209
Survey no.
16/1 16/4 16/7 16/8 17/3 17/4
North boundary
internal side
East boundary
internal road side
South boundary
building no 07
West boundary
rear side
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 858m away · 1 clinic within 1km
LifestylePark 1.5km away
ShoppingNo supermarket within 2km
Getting around
Expressway 295 m · Alibag RoadPrimary road 830 m · Alibaug Rewas RoadRailway line 4.2 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 974 mWater body 1.2 km
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~67 m of the recorded location in 2016 — before this project started in 2025. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~67 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~67 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • The yearly site view ends in 2023, before this project started in 2025.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Collector Of Raigad Alibag

Collector office
Building Permit
Survey no. 16/1 16/4 16/7 16/8 17/3 17/4

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Collector Of Raigad Alibag

Planning authority

Has approved 6 RERA projects0% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
6
On record
0 flats · 0 plots
Since
2025

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

08

Other projects nearby

The register · within 25 km

125 residential projects still under way within 25 km. Step out ring by ring:

Of the 104 projects the radar draws within 6 km — every kind, every stage — 34 are residential projects still under way. This list keeps only those, and looks further out.

14 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Indraprastha Building 4

Indraprastha Associates · Gondhalpada · Alibag

Apr 2026registered
Dec 2026target completion
Scale40 flatsAuthorityMahaRERA
440 m awayResidential / Group Housing

Alibag Elysian

A Corporation · Chendhre · Alibag

Jun 2026registered
Dec 2033target completion
Scale32 flatsAuthorityMahaRERA
580 m awayResidential / Group Housing

Acons The Park Phase 1

Aarun Gulati · Chendhre · Alibag

Oct 2024registered
Dec 2030target completion
Scale83 flatsAuthorityMahaRERA
600 m awayResidential / Group Housing

Alibag Divine

A Corporation · Chendhre · Alibag

Jul 2025registered
Dec 2032target completion
AuthorityMahaRERA
640 m awayResidential / Group Housing

Alibag Nirvana

ACORP · Chendhre · Alibag

Oct 2023registered
Dec 2029target completion
AuthorityMahaRERA
680 m awayMixed

GOLDEN PALMS

AKSHAY BUILDERS · Varasoli · Alibag

May 2026registered
Dec 2029target completion
Scale199 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/indraprastha-building-6-gondhalpada-alibag-imflwqpt.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.