HORIZON
Share

AFFORDABLE HOUSING PROJECT AT 12 NUMBER STOP BHOPAL UNDER PRADHAN MANTRI AWAS YOJNA

P-BPL-25-5900 · RERA Madhya Pradesh · https://gethorizon.in/projects/affordable-housing-project-at-12-number-bhopal-huzur-jk9ekwx7

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
AFFORDABLE HOUSING PROJECT AT 12 NUMBER STOP BHOPAL UNDER PRADHAN MANTRI AWAS YOJNA
Units
20 flats

Timeline

Project startedAug 2024
RERA registeredAug 2025
Proposed completionJul 2027
TodaySep 2026
02

Builder’s track record

RERA Madhya Pradesh · Builder registration

MUNICIPAL CORPORATION BHOPAL

Government/Semi Government AgencyPromoter type
14Projects
1City
2019–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2,140 homes · 62 plotson the public record across 14 projects
₹697.00 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MUNICIPAL CORPORATION BHOPAL— the full portfolio →

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Bhopal
Tehsil
Huzur
Planning area
Bhopal
Address
KHASRA NO.34-243/2/1/1/2 PART GRAM SHAHPURA TAHSIL HUZUR DISST. BHOPAL
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 395m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.6 kmPrimary road 151 mRailway line 586 mRailway station 882m away (Misrod)Limited bus connectivity nearby
Water & environment
River 2.3 km · AjmarWater body 3.2 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹99.21 Cr declared to build 20 flats. What that works out to:

₹4.96 Crdeclared cost per flatall-in — land + construction

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹28,261per sq yd
₹33,800per sq m
Which rate
multi-storey residential
Matched to
The rate published for “PHOENIX CORPORATE PARK”, 180 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

VIDYA NAGAR CHARAN 3 MAUKHYA MARG PAR₹42,000 / sq m₹35,117 / sq yd240 m
SHALIMAR FORTLEZA₹65,000 / sq m₹54,348 / sq yd350 m
SAGAR EDEN GARDEN₹38,000 / sq m₹31,773 / sq yd360 m
CHINAR INCUBE BUSSINESS CENTRE₹30,000 / sq m₹25,084 / sq yd470 m
SURENDRA LAND MARK₹41,000 / sq m₹34,281 / sq yd500 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Bhopal

Town & Country Planning (DTCP)
Building Permitapproved 29 Aug 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bhopal

Town & Country Planning area · Bhopal district

Has approved 726 RERA projectsabout 1 in 7 in Madhya Pradesh.

a mixed market63% apartments · 37% plotted layouts.

Builders
444
On record
45,421 flats · 32,913.65 plots
Reach
2 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 63% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

75 residential projects still under way within 25 km. Step out ring by ring:

Of the 394 projects the radar draws within 6 km — every kind, every stage — 47 are residential projects still under way. This list keeps only those, and looks further out.

9 projects within 1 km — showing the nearest 6.

10 m awayApartment

THE CITADEL

AMALTAS INDIA LIMITED · Bhopal · Huzur

Jan 2025registered
Feb 2027target completion
Declared cost₹49.75 CrScale23 flatsAuthorityRERA Madhya Pradesh
10 m awayApartment

SAMARA GOLD, BLOCK-C PHASE -2

SAMARA BUILDCON LLP · Huzur

Apr 2023registered
Mar 2026target completion
possession revisedDeclared cost₹23.70 CrScale139 flatsAuthorityRERA Madhya Pradesh
10 m awayApartment

AAMRA VALLEY PHASE-3

M/S UJJAWALA HOUSING & FINANCE PVT. LTD · Huzur

Oct 2023registered
Dec 2026target completion
possession revisedDeclared cost₹6.64 CrScale48 flatsAuthorityRERA Madhya Pradesh
10 m awayApartment

SAMARA GOLD PHASE 2 BLOCK A AND B

SAMARA BUILDCON LLP · Huzur

Apr 2026registered
Nov 2027target completion
Declared cost₹63.62 CrScale5 flatsAuthorityRERA Madhya Pradesh
10 m awayApartment

AADARSH ABHINAV PARISAR

A R INFRASTRUCTURES · Huzur

Apr 2026registered
Aug 2028target completion
Declared cost₹63.78 CrScale33 flatsAuthorityRERA Madhya Pradesh
300 m awayApartment

FORTLEZA PHASE III

OPAL DEVELOPERS · Bhopal · Huzur

Apr 2026registered
Mar 2028target completion
Declared cost₹70.15 CrScale6 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.