HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

AKSHARA PARK

P52100016616 · MahaRERA · https://gethorizon.in/projects/akshara-park-marunji-mulshi-0n63zygl

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
AKSHARA PARK
Units
40 units
Mix
40 × 1 BHK
Carpet area
35–37 sq mper-unit range, as filed
Floors
6
Parking
40 spaces
Land area
1,698 sq m
Sanctioned built-up
1,832 sq m

Timeline

RERA registeredMay 2018
Proposed completionApr 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

40 units across 3 batches
TypeArea sq mCount
1 BHK3616
1 BHK3716
1 BHK358

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

GARVEDEVELOPERS

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2018–2021Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 104 new projects last year
  • 1,226 nearby projects
≈ locality centre · geocoded, verified · 18.6117, 73.7149 · © OpenStreetMap contributors
Village
Marunji
Taluka
Mulshi
District
Pune
Pincode
411057
Survey no.
55/3
North boundary
ROAD
East boundary
55 PART
South boundary
55 PART
West boundary
55 PART
What’s nearby
SchoolsNearest school 1.1km away · College or university 549m away
HealthcareHospital 169m away · 1 clinic within 1km
LifestylePark 1.7km away · Gym or sports centre 118m away
ShoppingNo supermarket within 2km
Getting around
Expressway 3.4 kmPrimary road 1.7 km · Wipro CircleMetro station 1.7km away (Wipro)Limited bus connectivity nearby
Water & environment
Water body 909 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

2,873 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,226 projects the radar draws within 6 km — every kind, every stage — 437 are residential projects still under way. This list keeps only those, and looks further out.

16 projects within 1 km — showing the nearest 6.

MarunjiResidential / Group Housing

PARK TITAN PHASE II

PRIDE PURPLE INFRASTRUCTURE

Apr 2022registered
Jun 2026target completion
AuthorityMahaRERA
MarunjiResidential / Group Housing

PARK TITAN PHASE III

PRIDE PURPLE INFRASTRUCTURE

Feb 2023registered
Jun 2027target completion
Scale411 flatsAuthorityMahaRERA
MarunjiResidential / Group Housing

PARK ASTRA PHASE III

PRIDE PURPLE INFRASTRUCTURE

Feb 2023registered
Jun 2026target completion
1 open complaintScale129 flatsAuthorityMahaRERA
MarunjiOthers

VAISHNAVI HOMES A WING

VAISHNAVI PROMOTERS AND DEVELOPERS

Feb 2024registered
Dec 2028target completion
Scale78 flatsAuthorityMahaRERA
MarunjiResidential / Group Housing

PARK TITAN PHASE IV

PRIDE PURPLE INFRASTRUCTURE

Apr 2024registered
Mar 2028target completion
Scale239 flatsAuthorityMahaRERA
MarunjiResidential / Group Housing

PARK TITAN PHASE V

PRIDE PURPLE INFRASTRUCTURE

Jun 2025registered
Aug 2029target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • Complaints before MahaRERA.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/akshara-park-marunji-mulshi-0n63zygl.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.