Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
152 units across 33 batches
TypeArea sq mCount
2 BHK544
2 BHK503
2 BHK511
2 BHK508
2 BHK438
2 BHK517
2 BHK548
2 BHK491
2 BHK558
2 BHK557
2 BHK514
2 BHK458
2 BHK458
2 BHK458
2 BHK454
2 BHK457
2 BHK454
1 BHK344
1 BHK344
1 BHK344
2 BHK454
1 BHK344
2 BHK454
2 BHK482
2 BHK544
2 BHK491
2 BHK491
2 BHK503
2 BHK462
2 BHK504
2 BHK503
2 BHK493
2 BHK477
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
152 homes · 45 plotson the public record across 2 projects
8,345 sq mbuilt-up filed
21,300 sq mplotted area
29,160 sq mland declared
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · College or university 961m away
HealthcareHospital 362m away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 420m away
ShoppingNo supermarket within 2km
Getting around
Expressway 3.3 kmPrimary road 2.2 km · Wipro CircleMetro station 2.2km away (Wipro)Limited bus connectivity nearby
Water & environment
Water body 1.2 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~50 m of the recorded location until 2016; a building is first visible in 2017 and is about 22 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~50 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2017.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~50 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate sits 3-10 km from other projects with the same pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
2 complaints · 2 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC005000000033562
30 Oct 2021
CC005000000033563
23 Oct 2021
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,815 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,271 projects the radar draws within 6 km — every kind, every stage — 450 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Complaints & litigation
Complaints before MahaRERA.
Appeals to the Appellate Tribunal: MahaRERA's own register.
Orders said not to be complied with: MahaRERA's own register.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/citrine-marunji-mulshi-9f3387va.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.