HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

DELUXE PALMS

P51500014589 · MahaRERA · https://gethorizon.in/projects/deluxe-palms-devlai-aurangabad-gc7uibgu

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
DELUXE PALMS
Units
104 units
Mix
54 × 2 BHK · 49 × 1 BHK · 1 × 4 BHK
Carpet area
36–82 sq mper-unit range, as filed
Floors
12
Buildings
4
Parking
41 spaces
Land area
5,138 sq m
Sanctioned built-up
6,130 sq m
Recreational open space
5,138 sq m

Timeline

RERA registeredDec 2017
Proposed completionMay 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

104 units across 13 batches
TypeArea sq mCount
2 BHK524
4 BHK821
2 BHK4611
2 BHK465
2 BHK485
1 BHK385
1 BHK425
2 BHK515
2 BHK565
1 BHK3716
2 BHK4714
1 BHK3623
2 BHK445

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

DELUXE BUILDCON

PartnershipPromoter type
Aurangabad, MAHARASHTRABased in
1Projects
1City
2017–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 180 new projects last year
  • 1,416 nearby projects
1 km radius · coordinates as filed · 19.0232, 72.8434 · © OpenStreetMap contributors
Village
Devlai
Taluka
Aurangabad
District
Aurangabad
Pincode
431005
Survey no.
GUT NO. 101 DEVLAI, TQ DIST AURANGABAD
North boundary
GUT NO 101
East boundary
GUT NO 101
South boundary
GUT NO 102
West boundary
GUT NO 103
What’s nearby
Schools1 school within 500m · 16 educational institutions within 1km · College or university 500m away
HealthcareHospital 298m away · 25 clinics within 1km · Pharmacy within 500m
LifestylePark 816m away · Gym or sports centre 773m away · 59+ restaurants and cafes within 1km
ShoppingSupermarket 991m away · Mall 1.2km away · Convenience store within 1km
Getting around
Expressway 707 m · Dr Babasaheb Ambedkar Marg (Vincent Road)Primary road 118 m · N C Kelkar MargRailway line 156 m · Western Railway (Slow)Railway station 443m away (Dadar)11 bus stops within 500m
Water & environment
Water body 1.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹27,174per sq yd
₹32,500per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Devlai”.
In force
2026-2027 schedule
Spread
₹25,753₹36,422 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

3,290 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,416 projects the radar draws within 6 km — every kind, every stage — 512 are residential projects still under way. This list keeps only those, and looks further out.

73 projects within 1 km — showing the nearest 6.

10 m awayOthers

YASH TRINITY

Bhalchandra Vinayak Wadnerkar · GNorth-400028 · Ward GNorth

Apr 2020registered
Sep 2026target completion
Scale77 flatsAuthorityMahaRERA
10 m awayOthers

BAWA AASHIYAAN PHASE 1

KAY BEE DEVELOPERS PVT. LTD. · DHARAVI

Jul 2020registered
Jun 2028target completion
Scale116 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

BAWA AASHIYAAN PHASE-II

KAY BEE DEVELOPERS PVT. LTD. · DHARAVI

Mar 2022registered
Dec 2027target completion
Scale111 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

FORTUNE MAKHDOOM

Namla Developers Private Limited · GNorth-400028 · Ward GNorth

Feb 2023registered
Dec 2027target completion
AuthorityMahaRERA
10 m awayResidential / Group Housing

Amara

Sharcon Mutha · GNorth-400028 · Ward GNorth

Feb 2023registered
Dec 2026target completion
AuthorityMahaRERA
10 m awayResidential / Group Housing

Sugee Gaurav

Sugee Twenty One Developers LLP · Shivaji Park

Dec 2024registered
Mar 2028target completion
Scale22 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • Complaints before MahaRERA.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/deluxe-palms-devlai-aurangabad-gc7uibgu.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.