These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
S.NO.6, HISSA NO.2/1, MOHAMMADWADI, TAL-HAVELI, DIST-PUNE-411060
North boundary
INTERNAL ROAD OUT OF S NO 6-2-1
East boundary
PART OF S NO 6 AND PROJECT OF KOOL HOMES
South boundary
PART OF S NO 6 HISSA NO 2-2
West boundary
MOHAMMADWADI HANDEWADI ROAD
What’s nearby
SchoolsNearest school 1.4km away · Library 1.3km away
HealthcareHospital 984m away · 1 clinic within 1km
LifestyleNo parks within 2km · Swimming pool within 2km
ShoppingSupermarket 1.6km away · Mall 1.8km away
Getting around
Expressway 2.8 kmPrimary road 2.6 km · Kondhwa Main RoadRailway line 2.2 km · Pune - Miraj Railway LineRailway station 3.0km awayLimited bus connectivity nearby
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹54,490per sq yd
₹65,170per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “MOHAMMADWADI”.
In force
2026-2027 schedule
Spread
₹39,156 – ₹73,822 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Anil Sykar
Building Permit
Survey no. S.NO.6, HISSA NO.2/1, MOHAMMADWADI, TAL-HAVELI, DIST-PUNE-411060
The promised possession date (2 Sep 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The planning authority
The body that approved this project. It has approved 4,607 RERA projects across 33 districts — about 1 in 4 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,851 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,228 projects the radar draws within 6 km — every kind, every stage — 434 are residential projects still under way. This list keeps only those, and looks further out.
22 projects within 1 km — showing the nearest 6.
200 m awayResidential / Group Housing
MEMORIES 90 - PHASE IV
M/s NAMO DEVELOPERS · MOHAMMADWADI · Haveli
4 yr 9 mo
Mar 2023registered
Dec 2027target completion
Government Guidance Rate₹54,490/sq ydScale88 flatsAuthorityMahaRERA