HORIZON
Share

Ghatkopar Virat CHSL

PR1180002600213 · MahaRERA · https://gethorizon.in/projects/ghatkopar-virat-chsl-ghatkopar-kurla-e7o1jauy

01

Complete project overview

MahaRERA · Registration filing
Units
27 units
Floors
13
Buildings
2
Parking
47 spaces
Land area
983 sq m
Sanctioned built-up
1,944 sq m

Timeline

RERA registeredApr 2026
Proposed completionDec 2029
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Storm Water Drains0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Omrushi Realcon

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Ghatkopar
Taluka
Kurla
District
Mumbai Suburban
Pincode
400077
Survey no.
195/42(part)
North boundary
Jay Vijay Building
East boundary
Hospital
South boundary
13.40 Mtr wide Garodia Nagar Road
West boundary
Waman Building
What’s nearby
Schools1 school within 1km · Library 1.3km away
HealthcareHospital 285m away · 8 clinics within 1km · Pharmacy within 500m
Lifestyle2 parks within 500m · Gym or sports centre 669m away · 20+ restaurants and cafes within 1km
ShoppingSupermarket 1.3km away · Bank 269m away
Getting around
Expressway 269 m · Mankhurd - EEH Link RoadPrimary road 1.3 km · Vasantdada Patil MargRailway line 995 m · Central Railways Express LineRailway station 1.0km away (Ghatkopar)4 bus stops within 500m
Water & environment
Water body 687 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,57,259per sq yd
₹1,88,080per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Ghatkopar”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 195/42(part)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,698 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,707 projects the radar draws within 6 km — every kind, every stage — 519 are residential projects still under way. This list keeps only those, and looks further out.

78 projects within 1 km — showing the nearest 6.

110 m awayResidential / Group Housing

PARK VIEW

MONTAGE INFRA DEVELOPERS PRIVATE LIMITED (EARLIER KNOWN AS VINAYAK DEVELOPERS) · Ghatkopar · Kurla

Jan 2024registered
Dec 2027target completion
Government Guidance Rate₹1,57,259/sq ydScale32 flatsAuthorityMahaRERA
150 m awayOthers

CYPRESS HEIGHTS

CAB CONSTRUCTION LLP · Ghatkopar · Kurla

Nov 2024registered
Dec 2029target completion
Government Guidance Rate₹1,57,259/sq ydScale49 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

Aurus

M/s. B CHOPDA REALTORS · Ghatkopar · Kurla

Apr 2024registered
Mar 2027target completion
Government Guidance Rate₹1,57,259/sq ydAuthorityMahaRERA
230 m awayMixed

Sidhivinayak Orchid

Sidhivinayak Developers · Ghatkopar · Kurla

Aug 2023registered
Dec 2026target completion
Government Guidance Rate₹1,35,871/sq ydScale116 flatsAuthorityMahaRERA
230 m awayOthers

Nav Ashish Premises Co-Operative Society Ltd

M/S S K Developers · Ghatkopar · Kurla

Jun 2024registered
Apr 2029target completion
Scale29 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

THE MANSION

Dhirajlal Kamdar · Kirol · Kurla

Jun 2025registered
Sep 2028target completion
Scale39 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.