This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
KADAM RESIDENCY
Units
25 units
Mix
9 × Shop · 8 × 2 BHK · 8 × 1 BHK
Carpet area
102–498 sq mper-unit range, as filed
Floors
6
Parking
1 spaces
Land area
663 sq m
Sanctioned built-up
894 sq m
Timeline
RERA registeredSep 2020
Proposed completionSep 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
25 units across 3 batches
TypeArea sq mCount
2 BHK4988
1 BHK3518
Shop1029
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Taluka
Ratnagiri
District
Ratnagiri
Pincode
415639
Survey no.
sur no 373 CTS NO 650
North boundary
16-59-29-74N-73-19-9-32E
East boundary
16-59-30-17N-73-19-9-77E
South boundary
16-59-29-50N-73-19-10-61E
West boundary
16-59-29-10N-73-19-10-11E
What’s nearby
SchoolsNo schools within 2km · College or university 1.2km away
HealthcareHospital 359m away · 1 clinic within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.9km away · Swimming pool within 2km
ShoppingSupermarket 788m away · Bank 647m away
Getting around
Expressway 943 m · Hathkambe Ratnagiri Road; Mumbai Ratnagiri HighwayPrimary road 24 mRailway line 2.0 kmRailway station 3.8km away (Ratnagiri)Bus stop within 1km
Water & environment
River 1.5 km · Kajvi
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
88 residential projects still under way within 25 km. Step out ring by ring:
Of the 291 projects the radar draws within 6 km — every kind, every stage — 79 are residential projects still under way. This list keeps only those, and looks further out.
10 projects within 1 km — showing the nearest 6.
NachaneOthers
KESHAVRAJ
Anil Bajarang Channe
4 yr
Dec 2023registered
Dec 2027target completion
⚠ no escrow declaredScale24 flatsAuthorityMahaRERA