HORIZON
Share

M J OPERA

P52100032413 · MahaRERA · https://gethorizon.in/projects/m-j-opera-wakad-mulshi-necmicz6

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
248 units
Floors
23
Buildings
8
Parking
739 spaces
Land area
8,900 sq m
Sanctioned built-up
14,323 sq m

Timeline

RERA registeredJan 2022
Proposed completionOct 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

M/S SHIVDAN CONSTRUCTIONS

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Wakad
Taluka
Mulshi
District
Pune
Pincode
411057
Survey no.
SURVEY NO 34/1/B , 36/3/1
North boundary
18 35 18 14 N 73 45 15 05 E
East boundary
18 35 14 80 N 73 45 17 79 E
South boundary
18 35 18 58 N 73 45 16 80 E
West boundary
18 35 14 99 N 73 45 16 57 E
What’s nearby
Schools2 schools within 1km · 9 educational institutions within 1km · Library 181m away
HealthcareHospital 375m away · 15 clinics within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 485m away · 100+ restaurants and cafes within 1km
ShoppingSupermarket 501m away · Mall 1.5km away · Convenience store within 1km
Getting around
Expressway 1.9 kmPrimary road 4 m · Kaspate Vasti RoadRailway line 4.1 km · Mumbai–Pune RailwayMetro station 1.9km away (Wakad Chowk metro Station)2 bus stops within 500m
Water & environment
River 1.0 km · Mula
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹68,746per sq yd
₹82,220per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Wakad”.
In force
2026-2027 schedule
Spread
₹41,397₹86,957 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pimpri Chinchwad Municipal Corporation

Municipal Corporation
Building Permit
Survey no. SURVEY NO 34/1/B , 36/3/1

The promised possession date (31 Oct 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pimpri Chinchwad Municipal Corporation

Municipal corporation

Has approved 1,391 RERA projectsabout 1 in 14 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,273 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,211 projects the radar draws within 6 km — every kind, every stage — 720 are residential projects still under way. This list keeps only those, and looks further out.

15 projects within 1 km — showing the nearest 6.

10 m awayOthers

SENTOSA ELITE

SHANTI CONSTRUCTIONS · Wakad · Mulshi

Jul 2023registered
Jun 2026target completion
Government Guidance Rate₹68,746/sq ydScale91 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Courtyard 15 NXT Phase 2

UNIVERSAL DEVELOPMENTS · Chikhali · Haveli

Sep 2025registered
Dec 2030target completion
Government Guidance Rate₹45,569/sq ydScale182 flatsAuthorityMahaRERA
10 m awayMixed

Royal View

A. K. Developers · Pimpri Chinchawad · Haveli

Nov 2025registered
Jul 2028target completion
Government Guidance Rate₹58,077/sq ydScale36 flatsAuthorityMahaRERA
10 m awayMixed

P.K.CANOPUS

P K GROUP · Wakad · Mulshi

Oct 2025registered
Jun 2029target completion
Government Guidance Rate₹68,746/sq ydScale127 flatsAuthorityMahaRERA
10 m awayMixed

Avis Avante

Akshay Associates · Pimpri Chinchawad · Haveli

Mar 2026registered
Jan 2028target completion
Government Guidance Rate₹58,077/sq ydScale22 flatsAuthorityMahaRERA
10 m awayMixed

Varenyam

Dreamera Developers · Chikhali · Haveli

Mar 2026registered
Dec 2027target completion
Government Guidance Rate₹45,569/sq ydScale14 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.