This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
485 units
Mix
246 × Studio · 221 × 1 BHK · 18 × 2 BHK
Carpet area
15–51 sq mper-unit range, as filed
Floors
5
Buildings
7
Land area
14,136 sq m
Sanctioned built-up
14,806 sq m
Recreational open space
1,641 sq m
Timeline
RERA registeredAug 2020
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
485 units across 8 batches
TypeArea sq mCount
1 BHK3675
2 BHK481
2 BHK5012
1 BHK342
2 BHK514
2 BHK481
1 BHK27144
Studio15246
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Complete project overview — done
02
Builder’s track record
MahaRERA · Builder registration
MAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD)
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 2.5 km · Palghar-Manor RoadPrimary road 2.8 kmRailway line 2.7 km · Mumbai - Delhi RailwayRailway station 4.1km away (Umroli)Limited bus connectivity nearby
Water & environment
Water body 3.0 km
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~67 m of the recorded location until 2022; a building is first visible in 2023 and is about 14 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~67 m of the filed location.
Satellite photographs of the same ground
Mar 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2023.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~67 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate sits 3-10 km from other projects with the same pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹30,937per sq yd
₹37,000per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Nandore”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint
MahaRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to MahaRERA appear here at all.
Number
Date
CC12603036
22 May 2026
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
349 residential projects still under way within 25 km. Step out ring by ring:
Of the 606 projects the radar draws within 6 km — every kind, every stage — 188 are residential projects still under way. This list keeps only those, and looks further out.
1 project within 1 km — showing the nearest 1.
810 m awayResidential / Group Housing
CENTRUM OCTAVE
SUN REALTORS · Palghar
3 yr 9 mo
Mar 2026registered
Dec 2029target completion
Government Guidance Rate₹29,766/sq ydScale53 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates.
06Complaints & litigation
Complaints before MahaRERA.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mahindra-happinest-palghar-2-phase-1-nandore-palghar-w9grh20k.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.