HORIZON
Share

ORO RESIDENTIAL SCHEME

P52200033222 · MahaRERA · https://gethorizon.in/projects/oro-residential-scheme-ahmadnagar-m-corp-vbhz3img

01

Complete project overview

MahaRERA · Registration filing
Project name
ORO RESIDENTIAL SCHEME
Units
55 units
Mix
33 × 3 BHK · 22 × 4 BHK
Carpet area
165–245 sq mper-unit range, as filed
Floors
14
Parking
122 spaces
Land area
7,972 sq m
Sanctioned built-up
13,616 sq m

Timeline

RERA registeredFeb 2022
Proposed completionDec 2027
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

55 units across 11 batches
TypeArea sq mCount
3 BHK1661
3 BHK1654
3 BHK1774
3 BHK1786
3 BHK1816
3 BHK1917
3 BHK1975
4 BHK2229
4 BHK2233
4 BHK2437
4 BHK2453

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

IMPERIO TOWERS

PartnershipPromoter type
Ahmednagar, MAHARASHTRABased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Ahmadnagar (M Corp.)
Taluka
Nagar
District
Ahmednagar
Pincode
414003
Survey no.
FINAL PLOT NO 44 AND 44/1
North boundary
FINAL PLOT NO 46-3 TO46-7
East boundary
AURUM COMMERCIAL COMPLEX
South boundary
FINAL PLOTNO 43-43 TO43-46
West boundary
FINAL PLOT NO 42
What’s nearby
Schools2 schools within 1km · 5 educational institutions within 1km · College or university 344m away
HealthcareHospital 3m away · 1 clinic within 1km · Pharmacy within 1km
Lifestyle2 parks within 500m
ShoppingNo supermarket within 2km · Bank 242m away
Getting around
Expressway 1.6 kmPrimary road 36 m · Ahmednagar Loni Dhanora RoadRailway line 3.0 kmRailway station 4.3km away (Ahmadnagar)Limited bus connectivity nearby
Water & environment
River 763 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Ahmednagar Municipal Corporation

Municipal Corporation
Building Permit
Survey no. FINAL PLOT NO 44 AND 44/1
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Ahmednagar Municipal Corporation

Municipal corporation

Has approved 19 RERA projects0.1% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
19
On record
322 flats · 0 plots
Since
2020

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

50 residential projects still under way within 25 km. Step out ring by ring:

Of the 151 projects the radar draws within 6 km — every kind, every stage — 47 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

200 m awayMixed

ARUNAM HIGH STREET & RESIDENCES

HARSHAL SANTOSH BHANDARI · Others · CTSO Ahmednagar

Mar 2026registered
Dec 2029target completion
Scale187 flatsAuthorityMahaRERA
410 m awayOthers

HARISHILA PARK

DEEPAK HARIBHAU BANGAR · Ahmadnagar · Nagar

Dec 2019registered
Dec 2026target completion
Scale60 flatsAuthorityMahaRERA
960 m awayResidential / Group Housing

SKY COURT

PRANALI INFRA · Ahmadnagar · Nagar

Apr 2023registered
Jun 2026target completion
Scale28 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.