HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

VIVEKANAND ROW BUNGALOW

P52200046161 · MahaRERA · https://gethorizon.in/projects/vivekanand-row-bungalow-ahmadnagar-m-corp-9evekgx8

01

Complete project overview

MahaRERA · Registration filing
Project name
VIVEKANAND ROW BUNGALOW
Units
17 units
Mix
16 × 1 RK · 1 × 1 BHK
Carpet area
26–48 sq mper-unit range, as filed
Floors
1
Parking
17 spaces
Land area
1,088 sq m
Sanctioned built-up
1,088 sq m

Timeline

RERA registeredJun 2022
Proposed completionDec 2026
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

17 units across 6 batches
TypeArea sq mCount
1 RK321
1 RK261
1 RK323
1 BHK481
1 RK309
1 RK302

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

YOGESH BALASAHEB MUSTAPURE

IndividualPromoter type
Ahmednagar, MAHARASHTRABased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 8 new projects last year
  • 148 nearby projects
1 km radius · coordinates as filed · 19.0948, 74.7480 · © OpenStreetMap contributors
Village
Ahmadnagar (M Corp.)
Taluka
Nagar
District
Ahmednagar
Pincode
414111
Survey no.
70/4A&4A/1&2/704B
North boundary
PLOT NO 11 TO 14-1 TO 11 TO 14-3
East boundary
PLOT NO 8 TO 11-1 TO 8 TO 11-3
South boundary
6 MTR ROAD
West boundary
SR NO 75-4
What’s nearby
Schools1 school within 1km · College or university 1.5km away
HealthcareHospital 133m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 779m away · Swimming pool within 2km
ShoppingSupermarket 1.1km away · Bank 527m away
Getting around
Expressway 12 m · Ahmednagar FlyoverPrimary road 21 m · राष्ट्रीय महामार्ग ६१Railway line 3.2 kmRailway station 3.6km away (Ahmadnagar)Bus stop within 1km
Water & environment
River 687 mWater body 831 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

50 residential projects still under way within 25 km. Step out ring by ring:

Of the 148 projects the radar draws within 6 km — every kind, every stage — 46 are residential projects still under way. This list keeps only those, and looks further out.

14 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

KRUSHNA HEIGHTS

KRISHNA CONSTRUCTIONS · Ahmadnagar · Nagar

Nov 2021registered
Dec 2026target completion
Scale60 flatsAuthorityMahaRERA
10 m awayOthers

BORUDE ELITE

EXTREME PROPERTIES · Ahmadnagar · Nagar

Dec 2021registered
Dec 2026target completion
Scale20 flatsAuthorityMahaRERA
10 m awayOthers

SWAMI VIVEKANAND PALACE

VIVEKANAND CONSTRUCTION · Ahmadnagar · Nagar

Mar 2022registered
Dec 2026target completion
Scale131 flatsAuthorityMahaRERA
10 m awayOthers

Ariana

Marc Developers · Ahmadnagar · Nagar

Jun 2022registered
Mar 2027target completion
Scale57 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

STELLAR HEIGHTS

VISION GROUP · Ahmadnagar · Nagar

Apr 2022registered
Dec 2026target completion
Scale28 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

PINK CITY-II

AMIT ASHOK MUTHA · Ahmadnagar · Nagar

Nov 2022registered
Mar 2027target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vivekanand-row-bungalow-ahmadnagar-m-corp-9evekgx8.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.