HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

SAIRAJ PHASE 2-WING-A

P52200026159 · MahaRERA · https://gethorizon.in/projects/sairaj-phase-2-wing-a-shrigonda-mcl-sap1gpfv

01

Complete project overview

MahaRERA · Registration filing
Project name
SAIRAJ PHASE 2-WING-A
Units
49 units
Mix
25 × 1 BHK · 13 × 2 BHK · 11 × Shop
Carpet area
16–52 sq mper-unit range, as filed
Floors
8
Parking
37 spaces
Land area
1,925 sq m
Sanctioned built-up
2,599 sq m

Timeline

RERA registeredAug 2020
Proposed completionJun 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

49 units across 23 batches
TypeArea sq mCount
2 BHK522
2 BHK462
2 BHK463
1 BHK363
1 BHK371
1 BHK362
Shop251
1 BHK344
1 BHK362
1 BHK372
1 BHK371
1 BHK341
2 BHK432
Shop211
Shop311
Shop161
Shop182
Shop244
1 BHK365
2 BHK522
Shop201
2 BHK432
1 BHK374

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

BHASKAR JAYWANT KALE

IndividualPromoter type
Ahmednagar, MAHARASHTRABased in
2Projects
1City
2018–2022Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
68 homeson the public record across 2 projects
3,603 sq mbuilt-up filed
2,762 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from BHASKAR JAYWANT KALE— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 8 new projects last year
  • 148 nearby projects
1 km radius · coordinates as filed · 19.0948, 74.7480 · © OpenStreetMap contributors
Village
Shrigonda(MCL)
Taluka
Shrigonda
District
Ahmednagar
Pincode
413701
Survey no.
PLOT NO. 1102/2/1/2/3/4
North boundary
12 M INTERNAL ROAD
East boundary
PLOT NO 5
South boundary
PART OF S NO 1102
West boundary
MANDAVGAN ROAD
What’s nearby
Schools1 school within 1km · College or university 1.5km away
HealthcareHospital 133m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 779m away · Swimming pool within 2km
ShoppingSupermarket 1.1km away · Bank 527m away
Getting around
Expressway 12 m · Ahmednagar FlyoverPrimary road 21 m · राष्ट्रीय महामार्ग ६१Railway line 3.2 kmRailway station 3.6km away (Ahmadnagar)Bus stop within 1km
Water & environment
River 687 mWater body 831 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹17,977per sq yd
₹21,500per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Shrigonda(MCL)”.
In force
2026-2027 schedule
Spread
₹17,141₹20,259 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

51 residential projects still under way within 25 km. Step out ring by ring:

Of the 148 projects the radar draws within 6 km — every kind, every stage — 47 are residential projects still under way. This list keeps only those, and looks further out.

15 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

KRUSHNA HEIGHTS

KRISHNA CONSTRUCTIONS · Ahmadnagar · Nagar

Nov 2021registered
Dec 2026target completion
Scale60 flatsAuthorityMahaRERA
10 m awayOthers

BORUDE ELITE

EXTREME PROPERTIES · Ahmadnagar · Nagar

Dec 2021registered
Dec 2026target completion
Scale20 flatsAuthorityMahaRERA
10 m awayOthers

SWAMI VIVEKANAND PALACE

VIVEKANAND CONSTRUCTION · Ahmadnagar · Nagar

Mar 2022registered
Dec 2026target completion
Scale131 flatsAuthorityMahaRERA
10 m awayOthers

Ariana

Marc Developers · Ahmadnagar · Nagar

Jun 2022registered
Mar 2027target completion
Scale57 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

STELLAR HEIGHTS

VISION GROUP · Ahmadnagar · Nagar

Apr 2022registered
Dec 2026target completion
Scale28 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

PINK CITY-II

AMIT ASHOK MUTHA · Ahmadnagar · Nagar

Nov 2022registered
Mar 2027target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/sairaj-phase-2-wing-a-shrigonda-mcl-sap1gpfv.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.