HORIZON
Share

PRAYOG

P51800001932 · MahaRERA · https://gethorizon.in/projects/prayog-andheri-2g11sgid

01

Complete project overview

MahaRERA · Registration filing
Project name
PRAYOG
Units
28 units
Mix
16 × 2 BHK · 8 × 3 BHK · 4 × 2.5 BHK
Carpet area
66–78 sq mper-unit range, as filed
Floors
9
Buildings
2
Parking
58 spaces
Land area
1,836 sq m
Sanctioned built-up
4,957 sq m
Recreational open space
276 sq m

Timeline

RERA registeredJul 2017
Proposed completionDec 2017
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

28 units across 10 batches
TypeArea sq mCount
3 BHK772
3 BHK782
2.5 BHK762
3 BHK782
2.5 BHK762
3 BHK772
2 BHK664
2 BHK665
2 BHK663
2 BHK664

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

PSC PROPERTIES PRIVATE LIMITED

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
3Projects
1City
2017–2018Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
48 homeson the public record across 3 projects
11,099 sq mbuilt-up filed
5,747 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from PSC PROPERTIES PRIVATE LIMITED— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400055
Survey no.
CTS NO 2058 and 2074 FP NO 126 OF TPS V
North boundary
CTS 2059 and 2073
East boundary
WESTERN EXPRESS HIGHWAY
South boundary
RELIANCE ENERGY BUILDING
West boundary
PRABHAT COLONY ROAD NO 2
What’s nearby
Schools5 schools within 1km · 5 educational institutions within 1km · Library 1.8km away
HealthcareHospital 571m away · 11 clinics within 1km · Pharmacy within 1km
LifestylePark 1.1km away · Gym or sports centre 1.1km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 941m away · Bank 764m away
Getting around
Expressway 70 mPrimary road 741 mRailway line 361 mRailway station 504m away (Santa Cruz)8 bus stops within 500m
Water & environment
Water body 364 m · Vakola Nala
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,795 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,291 projects the radar draws within 6 km — every kind, every stage — 815 are residential projects still under way. This list keeps only those, and looks further out.

37 projects within 1 km — showing the nearest 6.

110 m awayMixed

Sanghvi Aria

SANGHVIP BUILDERS LLP · Vileparle · Andheri

Sep 2024registered
May 2027target completion
Scale88 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

OMKAR SAMARTH

PALKAR REALTY PRIVATE LIMITED · Bandra · Andheri

Sep 2025registered
Dec 2027target completion
AuthorityMahaRERA
220 m awayResidential / Group Housing

REDEVELOPMENT OF JAMUNA MAHAL CHSL

PRANAV CONSTRUCTIONS LIMITED · Bandra · Andheri

Dec 2023registered
May 2027target completion
Scale72 flatsAuthorityMahaRERA
260 m awayOthers

MANIKYA

ARYAMAN ENTERPRISES · MAHIM WEST

Jul 2024registered
Mar 2029target completion
Scale47 flatsAuthorityMahaRERA
380 m awayOthers

URBAN ORION

ASSOCIATED BUILDERS · Kurla

Dec 2024registered
Dec 2027target completion
Scale50 flatsAuthorityMahaRERA
390 m awayResidential / Group Housing

ZEE MILAN

ZEE RPM BUILDERS AND DEVELOPERS LLP · Andheri

Apr 2022registered
Mar 2026target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.