01

Complete project overview

MahaRERA · Registration filing
Units
93 units
Floors
15
Buildings
4
Parking
112 spaces
Land area
2,216 sq m
Sanctioned built-up
7,568 sq m

Timeline

RERA registeredMar 2024
Proposed completionDec 2028
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Landscaping & Tree…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
External finishes30%
Internal finishes90%
Stairs & lifts90%
Superstructure95%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

INTERLINK BUILDERS

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Bandra
Taluka
Andheri
District
Mumbai Suburban
Pincode
400055
Survey no.
CTS Nos 253/A &253/A/1 of village Bandra (East), F.P. No. 52/1 of TPS III at Santacruz (East).CTS No. 58(Part) (old CTS No. 262/A, 262/A/1 to 4) and CTS No. 58(Part) (old CTS No. 262/B, 262/B/1 to 5) of village Bandra-I
North boundary
Road
East boundary
CTS No 253 B F P No 52 2
South boundary
1 CTS No 261 F P No 57 2 CTS No 260 F P No 56A
West boundary
CTS No old 262 C F P No 58pt
What’s nearby
Schools4 schools within 1km · 4 educational institutions within 1km · College or university 1.8km away
HealthcareHospital 121m away · 10 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 1.1km away · 7 restaurants and cafes within 1km
ShoppingSupermarket 916m away · Bank 723m away · ATM within 500m
Getting around
Expressway 435 mPrimary road 545 m · Swami Vivekanand RoadRailway line 163 m · Western Railway (Fast)Railway station 334m away (Santa Cruz)4 bus stops within 500m
Water & environment
Water body 680 m · Vakola NalaCanal 897 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. CTS Nos 253/A &253/A/1 of village Bandra (East), F.P. No. 52/1 of TPS III at Santacruz (East).CTS No. 58(Part) (old CTS No. 262/A, 262/A/1 to 4) and CTS No. 58(Part) (old CTS No. 262/B, 262/B/1 to 5) of village Bandra-I
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,729 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,276 projects the radar draws within 6 km — every kind, every stage — 805 are residential projects still under way. This list keeps only those, and looks further out.

50 projects within 1 km — showing the nearest 6.

BandraResidential / Group Housing

MAYFAIR ARTH

MAYFAIR HOUSING

Aug 2026registered
Dec 2031target completion
Scale60 flatsAuthorityMahaRERA
BandraResidential / Group Housing

GULMARG PRIVE

J.M.B. Group of Companies

Apr 2026registered
Dec 2029target completion
Scale18 flatsAuthorityMahaRERA
BandraOthers

SUNFLOWER REALINFRA LLP ASTER

SUNFLOWER REALINFRA LLP

Jun 2025registered
Dec 2028target completion
no escrow declaredScale50 flatsAuthorityMahaRERA
BandraResidential / Group Housing

Trinity Towers

Jet Speed Realtors Private Limited

Aug 2025registered
Mar 2029target completion
Scale140 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

ROYAL MANSION

Lakhani Infra Projects LLP

Nov 2024registered
Dec 2028target completion
Scale43 flatsAuthorityMahaRERA
BandraMixed

KRISHNA RESIDENCY

RANGOLI DEVELOPERS

Nov 2025registered
Dec 2027target completion
Government Guidance Rate₹2,14,049/sq ydScale13 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.