96 TAGORE

P51900034416 · MahaRERA · https://gethorizon.in/projects/96-tagore-mumbai-city-b8hijja3

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
96 TAGORE
Units
41 units
Floors
16
Buildings
2
Parking
101 spaces
Land area
2,009 sq m
Sanctioned built-up
5,749 sq m
Recreational open space
292 sq m

Timeline

RERA registeredApr 2022
Proposed completionFeb 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

SSD VENTURES LLP

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400054
Survey no.
96 / G-151
North boundary
F P NO 37B CTS NO 152
East boundary
BY TAGORE ROAD
South boundary
F P NO 40 CTS NO 148
West boundary
F P NO 41
What’s nearby
Schools2 schools within 500m · 3 educational institutions within 1km
HealthcareHospital 194m away · 10 clinics within 1km · Pharmacy within 500m
LifestylePark 1.2km away · Gym or sports centre 186m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 113m away · Bank 102m away · ATM within 500m
Getting around
Expressway 1.0 kmPrimary road 216 m · Swami Vivekanand RoadRailway line 623 m · Western Railway (Slow)Railway station 652m away (Santa Cruz)13 bus stops within 500m
Water & environment
Water body 604 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Che/Ws/395/H/337(New)/Cc/1/New

Building Permit
Survey no. 96 / G-151

The promised possession date (22 Feb 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

3,672 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,045 projects the radar draws within 6 km — every kind, every stage — 760 are residential projects still under way. This list keeps only those, and looks further out.

54 projects within 1 km — showing the nearest 6.

180 m awayResidential / Group Housing

REDEVELOPEMENT OF SAMRAT CHSL

PRANAV CONSTRUCTIONS LIMITED · Juhu · Andheri

Dec 2023registered
Apr 2027target completion
Scale38 flatsAuthorityMahaRERA
190 m awayMixed

PRIYADARSHINI CHSL

PRANAV CONSTRUCTIONS LIMITED · Bandra · Andheri

Dec 2025registered
May 2029target completion
Scale24 flatsAuthorityMahaRERA
190 m awayResidential / Group Housing

DLH DAWN

Dev Land & Housing Pvt Ltd · Bandra · Andheri

Feb 2024registered
Jan 2027target completion
AuthorityMahaRERA
230 m awayMixed

AUM AURA

M/S AUM SERENITY · Bandra · Andheri

Aug 2025registered
Jul 2027target completion
Scale15 flatsAuthorityMahaRERA
260 m awayOthers

PSK ALTAIR 77

JAYDEEP DEVELOPERS · Bandra · Andheri

Nov 2024registered
Dec 2027target completion
Scale17 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Krishna Coniq

Skydome Realtors LLP · Bandra · Andheri

May 2026registered
Dec 2030target completion
Scale2 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.