Detailed Report

Purna Rajeshwari

P51800045796 · MahaRERA · https://gethorizon.in/projects/purna-rajeshwari-kurla-1e3643gn

01

Complete project overview

MahaRERA · Registration filing
Units
1 units
Floors
23
Buildings
2
Parking
3 spaces
Land area
1,164 sq m
Sanctioned built-up
3,917 sq m

Timeline

RERA registeredJun 2022
Proposed completionDec 2027
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out80%
External finishes90%
Sewerage (Chamber,…90%
Solid Waste Manage…90%
Water conservation…90%
Electrical meter r…90%
Fitness Area90%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Stairs & lifts100%
OC-readiness100%
Water Supply100%
Storm Water Drains100%
Fire protection an…100%
Open Parking100%
Refuge Area100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

DHARMI ENTERPRISES

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 186 new projects last year
  • 1,873 nearby projects
≈ locality centre · geocoded, verified · 19.0805, 72.9042 · © OpenStreetMap contributors
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400077
Survey no.
FP No 2 and CTS No 509
North boundary
Partly by FP No 2A and Partly FP No 1 of TPS III
East boundary
By Existing Road
South boundary
By known as Garodia Banglow
West boundary
Partly by M G Rd and Partly FP No 1 of TPS III
What’s nearby
Schools1 school within 1km · Library 1.6km away
HealthcareHospital 38m away · 18 clinics within 1km · Pharmacy within 1km
LifestylePark 685m away · Gym or sports centre 901m away · 30+ restaurants and cafes within 1km
ShoppingSupermarket 1.1km away · Bank 376m away
Getting around
Expressway 1.0 km · Mankhurd - EEH Link RoadPrimary road 793 m · Lal Bahadur Shastri MargRailway line 309 m · Central Railways Fast LineRailway station 727m away (Ghatkopar)Bus stop within 1km
Water & environment
Water body 902 m · Trombay Creek
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Bmc

Building Permit
Survey no. FP No 2 and CTS No 509
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bmc

Planning authority

Has approved 46 RERA projects0.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
46
On record
1,091 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,676 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,873 projects the radar draws within 6 km — every kind, every stage — 585 are residential projects still under way. This list keeps only those, and looks further out.

83 projects within 1 km — showing the nearest 6.

GhatkoparOthers

SAI SHANKAR

Shree Sai Realtors

Jan 2024registered
Dec 2028target completion
Scale141 flatsAuthorityMahaRERA
Greater MumbaiResidential / Group Housing

Kakkad

SILVER LAND DEVELOPERS PRIVATE LIMITED

Jun 2022registered
Dec 2026target completion
Scale44 flatsAuthorityMahaRERA
GhatkoparOthers

NIDHAAN CORPORATE PARK

NIDHAAN PROPERTIES LLP

Dec 2024registered
Dec 2027target completion
Government Guidance Rate₹1,35,871/sq ydScale143 flatsAuthorityMahaRERA
KurlaOthers

ASHAR TITAN

Ms ASHAR REALTORS

Jun 2022registered
Dec 2026target completion
Scale62 flatsAuthorityMahaRERA
KurlaOthers

Bhanushali Nagar

SHREE KUTCHHI BHANUSHALI SEVA SAMAJ TRUST

Mar 2021registered
Jun 2026target completion
Scale326 flatsAuthorityMahaRERA
GhatkoparOthers

RAJARAM MANSION

SHREE RUCHITA CORPORATION

Jun 2023registered
Dec 2027target completion
Government Guidance Rate₹1,49,065/sq ydScale18 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/purna-rajeshwari-kurla-1e3643gn.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.