HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

KEVLI PLAZA – A WING AND KEVLI DARSHAN – B WING

P51800051082 · MahaRERA · https://gethorizon.in/projects/kevli-plaza-a-wing-and-kevli-darshan-b-kirol-kurla-abxtw55c

01

Complete project overview

MahaRERA · Registration filing
Floors
21
Buildings
4
Parking
83 spaces
Land area
1,271 sq m
Sanctioned built-up
5,922 sq m
Recreational open space
115 sq m

Timeline

RERA registeredMay 2023
Proposed completionDec 2028
TodaySep 2026
Construction progress
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
OC-readiness20%
Podiums40%
Flat fit-out40%
Internal finishes50%
External finishes50%
Stairs & lifts90%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

M/s R K AND COMPANY PVT LTD

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 183 new projects last year
  • 1,812 nearby projects
1 km radius · coordinates as filed · 19.0825, 72.9084 · © OpenStreetMap contributors
Village
Kirol
Taluka
Kurla
District
Mumbai Suburban
Pincode
400077
Survey no.
5105 TO 5111, 5120 (PT) OF VILLAGE GHATKOPAR KIROL, F.P NO 30 TPS-I GHATKOPAR (E) IN N WARD
North boundary
12 MT WIDE EXISTING HINGWALA LANE
East boundary
EXISTING PROPERTY HIRBAI DEVSHI SHRAVIKA SHALA
South boundary
EXISTING BUILDING KAKAD NIKETAN
West boundary
EXISTING BUILDING SIDDH DARSHAN
What’s nearby
Schools1 school within 500m · Library 1.8km away
HealthcareHospital 91m away · 20 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 434m away · 24+ restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Bank 125m away
Getting around
Expressway 923 mPrimary road 676 m · Lal Bahadur Shastri MargRailway line 289 m · Central Railways Express LineRailway station 353m away (Ghatkopar)6 bus stops within 500m
Water & environment
Water body 1.2 km · Trombay Creek
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 — before this project started in 2023. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Feb 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • The yearly site view ends in 2023, before this project started in 2023.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 5105 TO 5111, 5120 (PT) OF VILLAGE GHATKOPAR KIROL, F.P NO 30 TPS-I GHATKOPAR (E) IN N WARD
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

4,998 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 1,812 projects the radar draws within 6 km — every kind, every stage — 637 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

94 projects within 1 km — showing the nearest 6.

60 m awayOthers

SAI PRAJAKTA

SUNIL MANGILAL JAIN · Mira-Bhayandar · Thane

May 2022registered
Dec 2027target completion
Government Guidance Rate₹60,034/sq ydScale45 flatsAuthorityMahaRERA
70 m awayResidential / Group Housing

72 PARKSYDE

ADESHWAR ASSOCIATES NX · Kurla

Jan 2021registered
Jun 2027target completion
Scale184 flatsAuthorityMahaRERA
80 m awayMixed

VAIBHAV SEASONS

VAIBHAV CONSTRUCTION · Ghatkopar · Kurla

Jun 2025registered
Mar 2030target completion
Government Guidance Rate₹1,35,871/sq ydScale100 flatsAuthorityMahaRERA
90 m awayResidential / Group Housing

OM NEELDHARA

D. D. Dezines Group · Kirol · Kurla

May 2024registered
Jun 2028target completion
Government Guidance Rate₹1,35,653/sq ydScale42 flatsAuthorityMahaRERA
110 m awayMixed

Rajshree Aranya

Rajshree Realtors Private Limited · Ghatkopar · Kurla

Feb 2026registered
Dec 2029target completion
Scale46 flatsAuthorityMahaRERA
130 m awayOthers

AUM LAXMINARAYAN

AUM ALAG DEVELOPER · Ghatkopar · Kurla

Nov 2024registered
Dec 2027target completion
Government Guidance Rate₹1,35,871/sq ydScale67 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kevli-plaza-a-wing-and-kevli-darshan-b-kirol-kurla-abxtw55c.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.