The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Aurangabad (M Corp.)
Taluka
Aurangabad
District
Aurangabad
Pincode
431001
Survey no.
PLOT NO. 19 TO 30, GUT NO. 166 PART, SATARA
North boundary
PART OF LANDGUT NO 166
East boundary
6 METER WIDE ROAD LAND OF GUT NO 165
South boundary
6 METER WIDE ROAD
West boundary
PLOT NO 13 TO 18 6 METER WIDE ROAD
What’s nearby
SchoolsNearest school 1.4km away
HealthcareHospital 1.7km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 838 mPrimary road 4.6 km · CIDCO FlyoverRailway line 1.8 kmRailway station 3.3km away (Mukundawadi)Limited bus connectivity nearby
Water & environment
Water body 2.9 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Aurangabad Municipal Corporation
Municipal Corporation
Building Permit
Survey no. PLOT NO. 19 TO 30, GUT NO. 166 PART, SATARA
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Aurangabad Municipal Corporation
Municipal corporation
Has approved 54 RERA projects — 0.3% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
53
On record
324 flats · 0 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
341 residential projects still under way within 25 km. Step out ring by ring:
Of the 471 projects the radar draws within 6 km — every kind, every stage — 169 are residential projects still under way. This list keeps only those, and looks further out.