HORIZON
Share

SAHEJANAND

P52000076845 · MahaRERA · https://gethorizon.in/projects/sahejanand-vadghar-ct-panvel-v9oal7x8

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
14 units
Floors
5
Buildings
2
Parking
4 spaces
Land area
180 sq m
Sanctioned built-up
269 sq m

Timeline

RERA registeredJun 2024
Proposed completionJun 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Prasad Construction

PartnershipPromoter type
Raigarh, MAHARASHTRABased in
3Projects
2Cities
2017–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
45 homeson the public record across 3 projects
1,402 sq mbuilt-up filed
1,193 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Prasad Construction— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Vadghar (CT)
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
Plot No - 83, Sector - 1
North boundary
9 M Wide Road
East boundary
Plot No - 82
South boundary
Plot No - 90
West boundary
Plot No - 84
What’s nearby
SchoolsNearest school 1.3km away
HealthcareHospital 1.4km away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.3km away
ShoppingSupermarket 1.4km away
Getting around
Expressway 342 m · Amra MargPrimary road 1.7 km · Palm Beach MargRailway line 239 m · Uran LineRailway station 2.7km away (CBD Belapur)Bus stop within 500m
Water & environment
Water body 478 mRiver 839 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹46,238per sq yd
₹55,300per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Vadghar (CT)”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

City and Industrial Development Corporation (CIDCO)

Development Authority
Building Permit
Survey no. Plot No - 83, Sector - 1

The promised possession date (30 Jun 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

City and Industrial Development Corporation (CIDCO)

Metropolitan / development authority

Has approved 885 RERA projectsabout 1 in 23 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
724
On record
7,061 flats · 987 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,552 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,175 projects the radar draws within 6 km — every kind, every stage — 357 are residential projects still under way. This list keeps only those, and looks further out.

82 projects between 1 and 3 km — showing the nearest 6.

1.4 km awayResidential / Group Housing

SHREEJI CLOUD

SHREEJI LIFESPACES INFRASTRUCTURE · Navi Mumbai · Thane

Oct 2023registered
Jun 2026target completion
Scale88 flatsAuthorityMahaRERA
1.5 km awayResidential / Group Housing

Bhimashankar

Shubh Construction · Ulawe · Panvel

Oct 2025registered
Dec 2029target completion
Scale88 flatsAuthorityMahaRERA
1.5 km awayOthers

PAYAL PARADISE

NANJI MURJI DAMA · Owle · Panvel

Apr 2022registered
Dec 2027target completion
Scale74 flatsAuthorityMahaRERA
1.6 km awayMixed

PROGRESSIVE AURA

Future Realty · Ulawe · Panvel

Jul 2026registered
Dec 2033target completion
Scale229 flatsAuthorityMahaRERA
1.6 km awayResidential / Group Housing

IMPERIAL TOWER-1

A K HITECH REALTY · Koyana Velhe · Panvel

Nov 2022registered
Mar 2027target completion
Government Guidance Rate₹43,144/sq ydAuthorityMahaRERA
1.6 km awayOthers

Antalya

M/S Sara Realty · Navi Mumbai · Thane

Aug 2022registered
Jun 2027target completion
Scale112 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.