Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
20 units across 6 batches
TypeArea sq mCount
2 BHK518
Shop124
Office144
Office161
Office141
Unit82
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
PLOT NO 01 SECTOR K NS - 1 SURVEY NO 126/1 SHIVAJI NAGAR AURANGABAD 431005
North boundary
18 METER WIDE ROAD
East boundary
PLOT NO 02
South boundary
GUT NO 126 1 PART
West boundary
11 METER WIDE ROAD
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 570m away
HealthcareHospital 177m away · 5 clinics within 1km
LifestylePark 822m away · 7 restaurants and cafes within 1km
ShoppingSupermarket 1.8km away · Mall 802m away · Convenience store within 500m
Getting around
Expressway 181 m · Jalna RoadPrimary road 1.6 km · Kranti ChowkRailway line 2.7 kmRailway station 3.1km away (Mukundawadi)Bus stop within 500m
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
341 residential projects still under way within 25 km. Step out ring by ring:
Of the 574 projects the radar draws within 6 km — every kind, every stage — 197 are residential projects still under way. This list keeps only those, and looks further out.