HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Plots
4 plots
Mix
4 × Bangalow / Villas
Booked
8 of 4 filed sold/bookedas declared in the RERA filing
Buildings
4
Land area
510 sq m
Floor area
444 sq m
Description
SANROYAL HASTHA VILLA

Timeline

Project startedDec 2020
RERA registeredJun 2024
Proposed completionDec 2024
TodayJul 2026
Construction progress

76% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
The external plumbing and external plastering100%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
The external plumbing and external plastering100%
Excavation100%
Basement(s) and Plinth100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
The external plumbing and external plastering100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 4 available
TypeArea sq mAvailable
Bangalow / Villas730 of 1
Bangalow / Villas950 of 1
Bangalow / Villas900 of 1
Bangalow / Villas950 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

SANROYAL BUILDERS AND CONTRACTORS PVT LTD

CompanyPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
15Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
700 homes · 67 plotson the public record across 15 projects
64,522 sq mbuilt-up filed
15,935 sq mplotted area
38,141 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporation3 of 14 projects
Kadinamkulam Grama PanchayatGrama Panchayat2 of 14 projects
Thiruvananthapuram Municipal CorporationMunicipal Corporation2 of 14 projects
Adat Grama PanjayathLocal body (LSGI)1 of 14 projects
Adat Gramma PanchayathLocal body (LSGI)1 of 14 projects
Guruvayur MuncipalityLocal body (LSGI)1 of 14 projects
LsgiLocal body (LSGI)1 of 14 projects
Nadathara PanchayathLocal body (LSGI)1 of 14 projects
Trivandrum Municipal CorporationMunicipal Corporation1 of 14 projects
Vembayam Grama PanchayatGrama Panchayat1 of 14 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Guruvayoor
Village
IRINGAPRAM
Taluk
Chavakkad
District
Thrissur
Pincode
680101
Survey no.
126/6-6
Patta no.
12295
What’s nearby
Schools1 school within 500m · 11 educational institutions within 1km · College or university 1.3km away
HealthcareHospital 101m away · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 1.6km away · 39+ restaurants and cafes within 1km
ShoppingSupermarket 253m away · Mall 1.4km away · Convenience store within 1km
Getting around
Expressway 2.2 kmPrimary road 14 m · Guruvayoor - Althara - Ponnani RoadRailway line 1.0 kmRailway station 1.0km away (Guruvayur)Bus stop within 500m
Water & environment
Water body 52 mCanal 442 m · guruvayoor valiya thodu
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan
Layout Permit
Survey no. 126/6-6

The promised possession date (17 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.