This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
SUDAMA REGENCY BUILDING NO 2,3,4
Units
205 units
Mix
95 × 1 BHK · 88 × 2 BHK · 21 × Shop · 1 × Office
Carpet area
7–74 sq mper-unit range, as filed
Floors
24
Buildings
3
Parking
71 spaces
Land area
15,590 sq m
Sanctioned built-up
13,613 sq m
Recreational open space
1,296 sq m
Timeline
RERA registeredJul 2017
Proposed completionDec 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
205 units across 23 batches
TypeArea sq mCount
Shop261
Shop251
Shop171
1 BHK3349
2 BHK4260
1 BHK3324
1 BHK3322
Shop161
2 BHK4528
Shop181
Office391
Shop221
Shop163
Shop421
Shop311
Shop191
Shop171
Shop92
Shop91
Shop111
Shop741
Shop162
Shop71
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 1.9 km · Mumbra Bypass FlyoverPrimary road 2.3 km · Kalyan - Shil RoadRailway line 2.1 kmRailway station 2.2km away (Diva Junction)Limited bus connectivity nearby
Water & environment
Water body 225 mRiver 647 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Thane (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923 – ₹1,55,185 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
6 complaints · 6 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC12500942
15 Jun 2026
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
5,333 residential projects still under way within 25 km. Step out ring by ring:
Of the 592 projects the radar draws within 6 km — every kind, every stage — 260 are residential projects still under way. This list keeps only those, and looks further out.
10 projects within 1 km — showing the nearest 6.
120 m awayResidential / Group Housing
VITHAI RESIDENCY
NANDKUMAR NARAYAN KINE · Thane
3 yr 11 mo
Jan 2026registered
Dec 2029target completion
Government Guidance Rate₹60,034/sq ydScale83 flatsAuthorityMahaRERA