HORIZON
Share

SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors

P51800008954 · MahaRERA · https://gethorizon.in/projects/smgk-associate-residency-wing-b-phase-1-andheri-e9rkjtvc

01

Complete project overview

MahaRERA · Registration filing
Project name
SMGK ASSOCIATE RESIDENCY Wing B Phase 1 -1st to 16th floors
Units
124 units
Mix
64 × 1 BHK · 56 × 2 BHK · 4 × 3 BHK
Carpet area
41–108 sq mper-unit range, as filed
Floors
20
Parking
100 spaces
Land area
1,450 sq m
Sanctioned built-up
8,018 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2018
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

124 units across 15 batches
TypeArea sq mCount
1 BHK4314
2 BHK6512
2 BHK6412
2 BHK6514
2 BHK6614
1 BHK4114
3 BHK1081
3 BHK1072
1 BHK4316
1 BHK4316
1 BHK472
2 BHK742
3 BHK1021
1 BHK442
2 BHK712

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Vastu Shilpa Complex Designers Pvt Ltd

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
1City
2017–2019Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
155 homeson the public record across 2 projects
9,141 sq mbuilt-up filed
2,900 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Vastu Shilpa Complex Designers Pvt Ltd— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400102
Survey no.
31E/9 Part of village Bandivali
North boundary
Adjoining Wing A
East boundary
31E upon 9 Part
South boundary
31E upon 9 Part
West boundary
Adjoining DP Road
What’s nearby
SchoolsNearest school 1.0km away · Library 736m away
HealthcareHospital 430m away · 8 clinics within 1km · Pharmacy within 500m
LifestylePark 1.2km away · Gym or sports centre 163m away · 63+ restaurants and cafes within 1km
ShoppingSupermarket 371m away · Mall 237m away · Convenience store within 1km
Getting around
Expressway 2.1 kmPrimary road 298 m · Link RoadRailway line 1.6 km · Central Railway (Harbour Line)Metro station 314m away (Lower Oshiwara)3 bus stops within 500m
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,651 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,149 projects the radar draws within 6 km — every kind, every stage — 738 are residential projects still under way. This list keeps only those, and looks further out.

29 projects within 1 km — showing the nearest 6.

100 m awayResidential / Group Housing

The Westpark Phase-1

WESTPARK DEVELOPERS PRIVATE LIMITED · Oshiwara · Andheri

Jun 2025registered
Jun 2032target completion
no escrow declaredGovernment Guidance Rate₹1,76,222/sq ydScale416 flatsAuthorityMahaRERA
220 m awayResidential / Group Housing

Transcon Triumph Tower 4

Transcon Triumph Phase 2 Private Limited · Andheri

Apr 2022registered
Mar 2027target completion
Scale182 flatsAuthorityMahaRERA
320 m awayMixed

Gurukrupa Ekam

GURUKRUPA REALCON INFRABUILD LLP · Oshiwara · Andheri

Nov 2025registered
Apr 2029target completion
Government Guidance Rate₹1,76,222/sq ydScale431 flatsAuthorityMahaRERA
360 m awayMixed

Veena Imperia

Veena Infratech LLP · Oshiwara · Andheri

Feb 2026registered
Dec 2030target completion
Scale176 flatsAuthorityMahaRERA
460 m awayMixed

Dream Signature

Prime Realtors · Oshiwara · Andheri

Jan 2026registered
Jun 2030target completion
Scale556 flatsAuthorityMahaRERA
470 m awayOthers

ESQUINA PRIVATE RESIDENCE

PRABHAKAR KUNTE CO OPERATIVE HOUSING SOCIETY LIMITED · Oshiwara · Andheri

Jul 2024registered
Jun 2029target completion
Scale21 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.